    Regardless of one's political affiliation, this is arguably, our government at work. Whether you are PNP/JLP, Jamaica is moving forward. No other government had such confidence in the parish of St Thomas. I only hope that the people of St. Thomas are supportive of such developments.

  • @ColinaSmith-rc9wu
    @ColinaSmith-rc9wu Před 4 měsíci +2

    Chec is responsible for base work, base compaction, drainage, and sidewalks for this section. There will be problems if those things aren't done properly. Chec contracted Smith Asphalting Company to do asphalt paving only. Chec is responsible for everything else. Including their left over materials at the side of the road.

  • @mrblacks333rr9
    @mrblacks333rr9 Před 4 měsíci

    Big Super bless up I'm very disappointed after the rain I see a lot of the portion of the road that they say is complete was saturated with water and I know you asked about the angle of the road to make sure this would not happen and yet it did. Ask Mr White head about it again please

  • @mikejohnson3601
    @mikejohnson3601 Před 4 měsíci

    The side walk and banking is another issue these are not finish all the left over materials just left on the sides