Local Breaker Backup (LBB) | Breaker Failure Relay (50BF)

Sdílet
Vložit
  • čas přidán 27. 07. 2020
  • Local Breaker Backup (LBB) or Breaker Failure Relay (50BF)
    Protection Operate for the fault clearance of a system by tripping other circuit breakers when the related circuit breaker fail to operate.

Komentáře • 50

  • @anbur9568
    @anbur9568 Před 2 měsíci +1

    ❤extraordinary knowledge sharing..keep post videos busbar protection,differential,ref etc

  • @petarsimic2303
    @petarsimic2303 Před 4 lety +2

    So far best relay protection channel on yt! Thank you for effort you put into videos Barani, We appreciate it!

  • @simonbenjamin7917
    @simonbenjamin7917 Před 3 lety +1

    I have really enjoyed the video. Especially the LBBP for 1&1/2 Breaker Scheme. it was on point

  • @user-wm5ti1od6r
    @user-wm5ti1od6r Před 4 měsíci +1

    Very good nice explanation

  • @sivananthambalasubramanian1202

    Nice presentation Barani sir. Thanks

  • @jamieroberts8902
    @jamieroberts8902 Před 2 lety +1

    Lots of examples, very helpful! Thank you 🙏

  • @sajivs486
    @sajivs486 Před 4 lety +1

    Thank you so much.

  • @alishafi9272
    @alishafi9272 Před 2 lety +1

    Appreciate your efforts sir. Learned alot.

  • @sandeepramkumar7503
    @sandeepramkumar7503 Před 4 lety +1

    Thanks sir

  • @bikramdas9770
    @bikramdas9770 Před 4 lety +1

    Thanks

  • @pratibhaprajapati7984
    @pratibhaprajapati7984 Před 5 měsíci +1

    thanks

  • @mohammednaveedhs4058
    @mohammednaveedhs4058 Před 4 lety +1

    Sir finally you made this video thank you sir another request 3- phase transformer stability and 1-phase transformer stability. In traction sites we are using 1-phase transformer.plz make a video on this

  • @gharikrishna2280
    @gharikrishna2280 Před měsícem +1

    While doing protection checks on down stream relay it's breaker is in already tripped condition any fault operated in the same relay in this scenario is LBB operation will occur in the up stream breaker

  • @kannirajulu
    @kannirajulu Před 3 lety +1

    Thank u for sharing knowledge

    • @baranitech1026
      @baranitech1026  Před 3 lety

      most welcome

    • @kannirajulu
      @kannirajulu Před 3 lety

      @@baranitech1026 bharani sir,am working on sel487B,can u help in lbb configuration, rajesh134@gmail.com

    • @baranitech1026
      @baranitech1026  Před 3 lety

      @@kannirajulu chat.whatsapp.com/EwWBppukxNTIoDJAE6e1NU you can post your doubt over here . on sel i am not much familiar

  • @himanshu2232
    @himanshu2232 Před 4 lety +2

    Nice vedio sir.👍👍👍👍👍

  • @meghanasr3098
    @meghanasr3098 Před 17 dny

    Sir do the ABB relay protection testing videos

  • @aeerdkptcl4017
    @aeerdkptcl4017 Před 2 lety +1

    Excellent sir.
    Please explain binary inputs
    GOOSE signals

  • @Yusup_oke
    @Yusup_oke Před 3 lety +1

    Nice bro very clear, how about the sf6 2nd stage logic in GIS bro maybe you can create the video also.

  • @sivananthambalasubramanian1202

    09.45 sir, why should the OG 1 send LBB initiation to remote end ss?

  • @dittikatisatish4239
    @dittikatisatish4239 Před 3 lety +1

    Hi sir thak you for your valuable videos and im having one doubt in this video in 1and half breaker system you have explained if main breaker fais to trip but my doubt is what if a tie breaker fails to trip then what will be sequence of operation in lbb protection..?

  • @SunilSingh-uy2re
    @SunilSingh-uy2re Před 2 lety +1

    In your video with dual busbar single breaker scheme both of the bus sections are connected via bus coupler. Bus coupler is in ON state but you said breaker of the particular bus section will trip !! How ?

  • @sameer81kulu
    @sameer81kulu Před rokem

    breaker failure is on buscoupler cb in double bus scheme then which cbs it should trip

  • @vinoddas8773
    @vinoddas8773 Před 4 lety +1

    Kindly make a video for Pole slip protection of generator....

  • @mr.biplob3795
    @mr.biplob3795 Před 3 lety +1

    Busbar stability how to injection Primary setup & secondary setup as well as how to check T protection,what is the arrangement for one and half scheme primary &secondary, please sir one tutorial we want from you side.

  • @rohiths5987
    @rohiths5987 Před 3 lety +1

    Sir please mention your email id I need to solve my doudts on Protection on 400 KV One and Half scheme and 220 KV Double main transfer

  • @AkashSingh-br4yp
    @AkashSingh-br4yp Před 25 dny +1

    I am not satisfied this vedio
    Itna ghuma rhe ho ek line ka ans he

    • @baranitech1026
      @baranitech1026  Před 23 dny

      sorry if i am not satisfied . i will try to make other better video thank you