PART 46 I GUEST HOUSE CONSTRUCTION I GROUND FLOOR CONCRETE PREPARATION
Vložit
- čas přidán 2. 01. 2023
- #housebuildinginthephilippines #retiredandhappyinphilippines
#construction #LipaCity #Batangas
PART 46 I GUEST HOUSE CONSTRUCTION I GROUND FLOOR CONCRETE PREPARATION
For question message us:
Facebook: / retiredandhappyinph
Email: retiredandhappyinphilippines@gmail.com
Mailing Address:
P.O. Box 43180
4217 Lipa City
Batangas ,Philippines
I was marveling over the advancement of a laser level when the guy walked in the frame carrying/spreading rock - half a bag at a time. LOL Snapped right out of that stupor.
It will be nice to see the pour, thank you both.
I wonder why they don’t use damp proof membrane (DPM) to stop rising damp on the floors?
House is taking shape 👍👍
The bottom area can be made in to another rent spot. I don't like prison bars. Looking to some nice designed bars that looks better. My place has been in construction 9 months. Think it will take another 5 months because of it is 3 floors and massive. Thank for all the videos, really helped with starting my project and see what can happen and what happened.
Guest House /Air BNB.
Are you going to skimm coat all your inner walls before you paint?
1 John 3:8-9
King James Version
8 He that committeth sin is of the devil; for the devil sinneth from the beginning. For this purpose the Son of God was manifested, that he might destroy the works of the devil.
9 Whosoever is born of God doth not commit sin; for his seed remaineth in him: and he cannot sin, because he is born of God. GODS BLESSINGS FOR YOU.