Time lapse - Industrial Building office space interior demolition

Sdílet
Vložit
  • čas přidán 18. 02. 2022
  • Formerly known as Lightolier and Philips Lighting, this large industrial building was recently leased to a company that specializes in creating and distributing architectural glass. Several renovations and changes have been ongoing; K. DeGray Demolition is proud to be performing all major demolition operations inside the structure, as both the main warehouse floor and office space are being transformed to fit the new tenants' needs. Here, you'll see what used to be the maintenance shop be stripped down to its original structure to accommodate the layout of the new office area.
  • Auta a dopravní prostředky

Komentáře • 7

  • @antharro
    @antharro Před 3 měsíci

    Exactly how it should be done. Good job!

  • @MrIndianapolis100
    @MrIndianapolis100 Před rokem

    How much it cost? Thank you.

  • @hh4545
    @hh4545 Před rokem

    Hi how long it take you to demolition and how many guys, may i ask, cause i am planning to demolition 2000sf office, has 3 rooms. Like to hear back from you. Thanks

  • @uwuwuwu525
    @uwuwuwu525 Před 2 lety +1

    If you guys run demolition like this u must be aiming 5% profit lollll

  • @MrFr33Ze
    @MrFr33Ze Před rokem

    How much does one charge for a commercial demolition?

    • @FardeenKhan-zd9tq
      @FardeenKhan-zd9tq Před 10 měsíci

      Charges are depend on the company size and all materials