Live for Power plant interview Q &A part 1

Sdílet
Vložit
  • čas přidán 12. 04. 2024
  • Power plant interview Q & A
    • Boiler circulation wat...
  • Věda a technologie

Komentáře • 34

  • @poonamrani3476
    @poonamrani3476 Před 2 měsíci +1

    Sir very nice video thanks. Salute to you

  • @sudhirsingh-ws4iw
    @sudhirsingh-ws4iw Před 3 měsíci +1

    Very nice sir

  • @MuhammadIlyas-tq8ch
    @MuhammadIlyas-tq8ch Před měsícem +1

    Sir, kindly make video on your experience based interview questions & answers.

  • @MuhammadIlyas-tq8ch
    @MuhammadIlyas-tq8ch Před 13 dny +1

    Sir we are desperately waiting for your latest question & answer session video. When will it be uploaded?

  • @rupeshsingh1003
    @rupeshsingh1003 Před 3 měsíci +1

    Sir please explain Generator H2 and N2 pressure variation according to load.

  • @user-qy8yj9gy5z
    @user-qy8yj9gy5z Před 3 měsíci +1

    Bahut badiya sir please explanation

  • @creativephysicsbymansibhar3003

    👏👏🙏🙏

  • @subhlabh9351
    @subhlabh9351 Před 3 měsíci +1

    Very good video sir ji

  • @vatsyadevanshu
    @vatsyadevanshu Před měsícem +1

    What will happen if all lp heaters are out of service.what are the possible situation may arise due to this.please explain sir

  • @swapnil1321
    @swapnil1321 Před 3 měsíci +1

    Sir explaination bahut practical or sahi hai

  • @abhishekpandey8773
    @abhishekpandey8773 Před 3 měsíci +1

    Superb Series Sir Plz make more videos on this At least 5 ...All Questions are Good, and Mostly These Questions are Asked in Interviews...
    But one more thing Sir , Plz Add Some Parameters in your Answers(for 660mw) ... Thank you So Much Sir.. 🙏

    • @kpatelbla
      @kpatelbla  Před 3 měsíci

      Ok, this series started on your demand.

  • @worldinstrumentationengineer
    @worldinstrumentationengineer Před 3 měsíci +1

    Camera ko hi horizontal karea sir setting se

  • @amiyaranjandash
    @amiyaranjandash Před 2 měsíci +1

    sir we need a topic of various main runbacks in powerplant....

  • @user-qy8yj9gy5z
    @user-qy8yj9gy5z Před 3 měsíci

    Furnace pressure positive Kya karege sir please

  • @0503manoj
    @0503manoj Před 3 měsíci +1

    Sir GE.
    If the one cw pump tripped at full load then what will be taken action for unit normalization. Please explain sir

    • @kpatelbla
      @kpatelbla  Před 3 měsíci

      Actually, I want to explain in that live, I will explain it in next live.

  • @sawansingh7490
    @sawansingh7490 Před 2 měsíci +1

    Sir turbine shaft का vibration x ,y position kis basis per सेट किया जाता है.

    • @kpatelbla
      @kpatelbla  Před 2 měsíci

      It is directional measurement both vibration probes are perpendicular to each other.

  • @amiyaranjandash
    @amiyaranjandash Před 3 měsíci +1

    Sir I have a career oriented question...I work as a C&I shift engineer in 135x4 mw unit...& I have just got offer letter from a 25x2 MW unit with 50% hike.. should I switch ?

    • @kpatelbla
      @kpatelbla  Před 3 měsíci

      1)First thing which organisation where you are going I mean if it is more reputed than present organization.
      2) Location - if it is located at better location that will provide better medical and schooling for future perspective.
      3) If you are going to take better position.
      These are my personal opinion discussion is your.

    • @0503manoj
      @0503manoj Před 2 měsíci +1

      Dear sir
      Good afternoon
      Sir if the 600MW LP turbine# 2 last stage blade will be removed from shrouds at both side all 46 blade then after what would be change in turbine critical speed...? and other thing else.

    • @kpatelbla
      @kpatelbla  Před 2 měsíci

      Removed or damaged?

  • @0503manoj
    @0503manoj Před 2 měsíci +1

    Sir primary water tank ka level High hone ka kya .. reason kya ho sakta hai sir 600 MW BHEL unit ka

    • @kpatelbla
      @kpatelbla  Před 2 měsíci

      Firstly flush level transmitter it could be malfunction, check for H2 cooler leakage but there are very few chances of second one.

  • @0503manoj
    @0503manoj Před 2 měsíci +1

    Sir turbine 600 me BHEL evaluation valve ka function kya hota hai...

    • @kpatelbla
      @kpatelbla  Před 2 měsíci

      Are you asking Turbine stress Evaluation?

    • @0503manoj
      @0503manoj Před 2 měsíci +1

      @@kpatelbla sorry sir.. i am asking about turbine evacuation valve

    • @kpatelbla
      @kpatelbla  Před 2 měsíci

      Ok, HP evacuation actually the main purpose of this valve is to vent out HP Turbine steam into the condenser in case of Turbine tripped consequently prevent Turbine overspeed because of trapped steam.

  • @user-gv7fp2tu9z
    @user-gv7fp2tu9z Před 3 měsíci +1

    Very nice sir