"It's a high risk project and that's what GKR are all about" Portland House, London

Sdílet
Vložit
  • čas přidán 18. 06. 2023
  • Our external scaffold on Portland House is complete!
    We have provided full scaffold independent to all 30 storeys of the building. With the glass canopy beneath three elevations, our scaffold could not be ground-bearing, meaning the cantilevered scaffold was designed on multiple levels.
    The scale and height of the works created a high-risk environment. The project required careful planning due to working within a heavily pedestrianised area and next to a live rail line.
    #WeAreGKR #BetterFuture #Construction #London #Scaffold #ItHasToBeNASC
  • Věda a technologie

Komentáře •