- Cat 330DL excavating up to 7 metres deep using dragbox to lay 900mm concrete pipes for a sewer pipeline on Cork Lower Harbour Main Drainage Project.
Roadform Ltd Building & Civil Engineering Contractors.
www.roadform.ie
You guys did a great job laying the pipeline so easy great job job well done
hill man should already have those rubbers on and ready!!!
Fire hillman!!
You mean top man
Good knowledge for tranch excavation work.. All over world...
Trench
got to cut those sides down 18 inches on each side of the trench box 18 inches the top of trench box
Great!!
Very nice
rock box will save $$$$ and put gaskets on up on bank. Saves time and time is money
how is that fella in the trench with all that dust. Christ I would never.
Have you guys ever done this before?
Top man should have done had that cable around the pipe an rubber on an greased when ur ready to hook up under the condition ur working under
We use this method because we have no quality issues when the seal is put on the pipe just before joining Chris
I don't understand why you guys run that shield all the way to the bottom. You don't have to do that. You dig with your shield tight in the side. S keep it about 2 and a 1/2 3 feet off the bottom.
Little rough on the controls friend.
Should use a stone box. Like this the excavator does not have to travel
We don't use stone boxes in Ireland Genio
@@roadformltd6297why tho
Why so much over dig on sides of box
The excavation is through gravel which kept falling in, its not over dug Luther
Why are you walking so far to hook pipe?
Its safer to keep men away from the excavation as ground conditions were poor
More info about cat
Hello how are im exclavator operator im from algeria i need work
No rock box?
Definitely doesn’t seem safe or osha approved to pull a trench box with a guy in it. 😅
So many things wrong in this Video !
Agree