Conrail Winter - Part 2 of 7

Sdílet
Vložit
  • čas přidán 16. 06. 2010
  • Photographer Rich Scheild's professional digital camera captures the last winter for Conrail and the worst in Conrail's history. Taped on the Dearborn Division, where 32 inches of snow fell in just a few days. Operations came to a halt with switches snow covered and frozen. We visit locations in Michigan and Ohio along the Detroit to Toledo line and on the Michigan line which runs from Detroit to Chicago.
  • Auta a dopravní prostředky

Komentáře • 5

  • @PeanutsAndSanrioFan
    @PeanutsAndSanrioFan Před 5 dny

    I’ve been to Millbury multiple times. Good location

  • @rogerrobertson2958
    @rogerrobertson2958 Před 5 lety +2

    I was on that SD-80 MAC, at Wyandotte, Mi. Had to pick-up 5 hi- cube cars @ (Warner Yard) Monroe, Mi. Then on to Toledo.

    • @stevekalis139
      @stevekalis139 Před 3 lety +1

      River rouge was always my favorite yard to work in, I got to service the 80” Great Lakes steel mill pulling coils, and other industries down the short and long marsh tracks, plus I don’t know if they still hump cars there but I was pretty good at getting the old heads an early quit by having the switches ready for each cut of cars we “kicked” into each track.

  • @ShawnyNorburn
    @ShawnyNorburn Před 5 lety +2

    Miss conrail. Good footage in part 2

  • @dwayneday2895
    @dwayneday2895 Před 3 lety +1

    CSX stop absorbing Conrail consolidated freight equipment that mine 17000units