WRG Canal Camp at Malswick. Week 2. Part 2.

Sdílet
Vložit
  • čas přidán 4. 08. 2022
  • In July 2022 Waterway Recovery Group (WRG) held three, week-long, Canal Camps at Malswick
    This video covers the second half of the second week. Watch part 1 first, here • WRG Canal Camp at Mals... .
    The team are concentrating on digging out a section of canal over the higher ground and using the removed subsoil to increase the ground level either side of the new large culvert pipe. Blockwork is also being laid at the new culvert junction chamber.
    For more information on The Herefordshire and Gloucestershire Canal Trust visit our website. www.h-g-canal.org.uk/
    For more information on WRG visit their website.
    waterways.org.uk/waterways/si...
    Music from CZcams Audio Library. Sunshine by The Mini Vandals.

Komentáře • 2

  • @andrewbarrett42
    @andrewbarrett42 Před 2 lety +1

    This is so exciting as I know the canal route very well.A lot of the canal is filled in between Hereford and Ledbury.

    • @herefordshireandgloucester1720
      @herefordshireandgloucester1720  Před rokem

      Thank you. A lot of it is filled in at the Gloucester end too. Like much of the route between Gloucester and Ledbury, this section at Malswick was replaced by the Ledbury and Gloucester Railway.