Relay Coordination Study Using ETAP | Part 2

Sdílet
Vložit
  • čas přidán 7. 09. 2024
  • Phase element coordination between downstream LV circuit breakers and upstream MV circuit breaker.

Komentáře • 15

  • @subbancc
    @subbancc Před 4 měsíci

    Thank you very much.

  • @syedhaiderkhawarzmi6269
    @syedhaiderkhawarzmi6269 Před 2 měsíci

    can you share what setting you had for distribution pannels, HVCB and cables?

  • @hanial-shadadi9122
    @hanial-shadadi9122 Před rokem

    Thanks
    It is very helpful.
    Regarding to the instantaneous trip , is it necessary to be set with new element or with the previous over current element. Also regarding to the ground fault trip what we should select?
    Thank u dear

  • @kitagawa4061
    @kitagawa4061 Před rokem

    Thak you very much sir.

  • @Doti_231
    @Doti_231 Před 6 měsíci

    Sir thank you for the videos, how you determine operating time T 0.50 second on the calculation for Relay 1??

  • @muhammadfajri5137
    @muhammadfajri5137 Před 6 měsíci

    Sorry Can i ask something. How to update library CB?

  • @RaymundSanone
    @RaymundSanone Před 9 měsíci

    sir, can you also discuss how genset circuit breaker in synchronizing panel trip coordination done, condition genset circuit breaker has lower ampere rating compare to the feeder it will serve since 3 genset in parallel

  • @khan_tanzeem0521
    @khan_tanzeem0521 Před rokem

  • @michaelatef2051
    @michaelatef2051 Před 10 měsíci

    Hi , how i can show the data of cables on sld as c.s.a and the length on sld in etap because it is hidden

  • @glaseegowee
    @glaseegowee Před rokem

    Sir, how do you determine the operating time? Thank you!

  • @johnw584
    @johnw584 Před rokem +1

    salamat sir

  • @LongVu-kl3np
    @LongVu-kl3np Před 11 měsíci

    thanks for sharing , can you send me the PDF calculation?

  • @fouzibouakkaz6896
    @fouzibouakkaz6896 Před rokem

    Goodmorning
    Please i need all presentation

  • @gustavomarcelo7250
    @gustavomarcelo7250 Před rokem

    Sir.
    CB5 and relay 1 curve overlap,is ir acceptable?
    Can I request for the file?