Dietrich Idaho Water Project 11-13-2013 Lay Pipe, Backfill, Install Culvert

Sdílet
Vložit
  • čas přidán 12. 11. 2013
  • 11-13-2013 Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install culvert, install fire hydrant.
  • Věda a technologie

Komentáře • 9

  • @jefffuchs2667
    @jefffuchs2667 Před 2 lety +1

    Tip: when laying C900, lay pipe with the numbers facing up. Also, before backfilling coat the valve in grease and wrap with wax tap and then 10 mil tape. This will preserve the valve and help the next guy out when they have to make repairs to the pipe/valve

  • @tombo552001
    @tombo552001 Před 5 lety

    Nice job and using tracer wire

  • @wolffry
    @wolffry Před 10 lety +4

    Where is your trenching protection?

    • @jfreeman3872
      @jfreeman3872 Před 5 lety +1

      Litteraly stole the words from my thoughts

    • @devalm9492
      @devalm9492 Před 3 lety

      My guess is because water main lines are only 4 feet under ground. I think trench protection only applies to certain trenches and after specific depths.

    • @omasis19
      @omasis19 Před 2 lety

      For what dast shallow as fak

  • @richardcameron3681
    @richardcameron3681 Před rokem

    Videos like this should be automatically deleted when safety and detailed pipe treatments are not used correctly why pass that along for others to follow and get hurt or killed and a pipe system with only portions of the manufactures recommended treatment