Dietrich Idaho Water Project 11-08-2013 Lay Pipe, Pour Concrete Thrust Blocks

Sdílet
Vložit
  • čas přidán 9. 09. 2024
  • 11-08-2013 Dietrich Idaho Water Project. Lay pipe, backfill, excavate, pour concrete thrust blocks.

Komentáře • 5

  • @carlosiscool51
    @carlosiscool51 Před 8 lety +1

    Lucky bastards ! Most of the times we have to mix the thrust blocks ourselves!!

  • @OscarRamirez-wi5bx
    @OscarRamirez-wi5bx Před 4 lety +1

    What is that 1 mil plastic around fittings and "T" dammm .

  • @geoffmackay9989
    @geoffmackay9989 Před 8 lety

    how many yards did you use ?

  • @haithamahmad9093
    @haithamahmad9093 Před 5 lety

    czcams.com/video/c8ze3VLHPnA/video.html what is the valve for? since its end of line?