1963 Ford Fairlane Tribute Build Ep. 6

Sdílet
Vložit
  • čas přidán 9. 03. 2024
  • The 1963 Ford Fairlane project continues with a suspension upgrade from CPP Classic Performance Products and Casey installs his brake kit. We paint the engine bay and underbody, get the clutch and flywheel installed and finally get the engine and transmission installed for the last time, hopefully. Rear brakes and shocks get installed as well as the radiator. Clutch master gets mounting with most of the existing linkage. Like and Subscribe for more updates to comes. Next time we install the fuel system, custom driveshaft etc. Thanks for watching!!!
    www.classicperform.com/
  • Auta a dopravní prostředky

Komentáře • 2

  • @farmall1951c
    @farmall1951c Před 3 měsíci

    NOW you feel like your gaining and getting somewhere LOL.

    • @paycheckmonster
      @paycheckmonster  Před 3 měsíci

      Finally making some good progress and having something that shows the hard work it takes to commit to a project like this. Thanks for watching!!