How I passed my first plumbing rough in inspection

Sdílet
Vložit
  • čas přidán 11. 06. 2024
  • I walk through how I passed my first plumbing rough in inspection. I discuss the drain and water supply line locations and sizes, hydrostatic and pressure tests, as well as minimum slopes and sub floor cut outs for the inspector. I hope this helps!
  • Věda a technologie

Komentáře • 1

  • @caypasha
    @caypasha Před 27 dny

    so bro are you a medical student, hobbyist builder and engineer?!