CPE #5 Monitor Tank supply to Hydrant

Sdílet
Vložit
  • čas přidán 30. 06. 2023
  • This evolution requires one Engine Company with four members, an engine mounted monitor and supply line. This timed evolution begins when the Engine stops, airbrake is applied.
    Standard requirements:
     Crew will have predetermined fire location target chosen, simulating a large fire on a second story balcony (the area, tree, side of building etc. needs to be chosen as the engine operator will have to be accurate with the deck gun.)
     The Engine Company stops at the fire scene and 2 members will hand jack 100’ of 4” and secure a hydrant supply.
     The Engine Operator will deploy and charge the monitor off tank water at the proper discharge pressure.
     The Operator will note how much water is used before accuracy is achieved on the “fire.” 10 seconds on the fire is minimum with tank supply.
     When the supply line is charged the Operator will switch over to hydrant water.
    Recommended maximum time for the evolution is 3 minutes.