they were laid on 4x6 for about 3 months , I'm mentioning this because that way they get air All around, I don't let them touch the ground , I have since cut some similar two months after cutting the trees down and they were a little moist in some parts 👍
Thanks for posting! This has inspired me to do the same with an oak tree I’ve recently cut down.
Make sure you have safety equipment ,and more than one Sharp chain👍
Very cool. I’m going to follow through
Very nice work.
How long did you let the logs sit before cutting?
they were laid on 4x6 for about 3 months , I'm mentioning this because that way they get air All around, I don't let them touch the ground , I have since cut some similar two months after cutting the trees down and they were a little moist in some parts 👍
What's the music??
The name of the son is , sleepless in gulustan thanks for watching and have a great day!