Night Time SkyTrain SkyBridge Maintenance Special Pt. 1 - Eastbound on the Westbound Track
Vložit
- čas přidán 7. 03. 2024
- Become a member of the channel:
/ @upliftvancouver
Join my Discord server:
/ discord
(11/09/2023) More track maintenance needed to be done on the SkyBridge, resulting in more single track operations. This time around, it was done at night time to minimize disruptions. - Věda a technologie
@2:33 that was such a troll by Translink lol
when does skytrain close for the night?
The last train from Waterfront to King George usually leaves just after 1AM on most nights.