Part 5. Building a house from gas blocks. Ground floor. A house from scratch with your own hands.
Vložit
- čas přidán 14. 07. 2024
- 00:00 start of the season
00:36 transfer of the concrete mixer with a homemade crane (more about the crane • Мини башенный кран )
01:12 beautiful rainbow
01:28 armopoyas under the slab of the landing
02:30 installation of the plate
03:28 night watch
03:38 installation of aerated concrete jumpers (in detail • Монтаж армированных пе... )
04:42 moving the tower crane (in detail • Перестановка и модерни... )
07:44 stroking the cat
09:27 we make vent channels with an ice drill
10:23 general view of the 1st floor
11:27 top view
11:39 we fill the 1st floor armopoyas with concrete
12:48 installation of floor slabs on the 1st floor
15:25 general view of the blocked 1st floor
16:09 preparing for winter
Labor costs:
1) wall construction 1 person 6 weeks
2) installation of jumpers 2 people 2 days
3) installation of vent channels 2 people 4 hours
4) laying of armature of the 1st floor armature 1 person 3 days
5) filling of the armopoyas with concrete 2 people 3 days
6) laying of floor slabs 4 people 2 hours
7) preparation for winter 2 people 1 day
Part 4. Building a house from gas blocks. The first floor with your own hands, the beginning. A house from scratch. • Часть 4. Постройка дом...
Part 3. Building a house from gas blocks. The base of the FBS blocks with their own hands. A house from scratch. • Часть 3. Постройка дом...
Part 2. Building a house from gas blocks. Ground floor with your own hands. A house from scratch. • Часть 2. Постройка дом...
Part 1. Building a house from gas blocks. The base of the FBS blocks with their own hands. A house from scratch. • Часть 1. Постройка дом... - Věda a technologie
Браво 👏👏👏
Александр Владимирович, раньше, бывало, возьмешь с тобой чего-нибудь горячительного да на кухне поговорить, где-нибудь в Анадыре - так всю ночь соловьем пел, а сейчас за 16 мин ни слова =)