Control Plan in Hindi/IATF 16949/APQP/PPAP/QDS/Quality Documents Solution

Sdílet
Vložit
  • čas přidán 27. 01. 2020
  • Please subscribe the channel and click lick as given below for watching more videos
    IATF 16949 Awareness
    • IATF 16949/ISO/TS/1st ...
    VSA T2 Checklist (Part-1)
    • VSA T2 Audit Checklist...
    VSA T2 Checklist (Part-2)
    • VSA T2 Checklist (Part...
    VSA T2 Checklist (Part-3)
    • VSA T2 Checklist (Part...
    Change Management
    • 4 M Change management ...
    MARU-A (Safety Parts)
    • MARU A/Special Charact...
    Types of Audit
    • Types of Audit in hind...
    *New Control Plan as per IATF 16949:2016
    • Control Plan in Hindi/...
    APQP - Advance product quality planning
    • APQP Training in Hindi...
    PPAP- Production Part Approval Process
    • PPAP Training in Hindi...
    *New FMEA- Failure Mode & Effect Analysis- 1st Edition
    • New FMEA(AIAG - VDA)/F...
    MSA- Measurement System Analysis
    • MSA Training in Hindi/...
    SPC-1 Statistical Process Control
    • SPC Training in Hindi/...
    SPC-2 Statistical Process Control
    • SPC Training in Hindi/...
    7 QC Tools
    • 7 QC tools in hindi/7 ...
    If there is any training required in your organization,
    please mail us on
    isovipinmandal@gmail.com
    or
    visit us on
    www.qualitydoc...

Komentáře • 34

  • @deepaktanwar3695
    @deepaktanwar3695 Před 10 měsíci

    Prototype and prelaunch control plan ko with format explain kro sir , usme kya kya dalnge kese kese dalenge

  • @haritsaini3121
    @haritsaini3121 Před 2 lety +1

    This is first video for me of this channel and i will see another videos also.
    It is a great Video about Control Plan. You have cleared everything about it.
    can you make one Video on Difference among PPAP, Control plan and APQP?
    And also explain How they relate to each other and What documents are required for each (PPAP, Control Plan and APQP). And give One Product example for understanding the difference among APQP, PPAP and Control Plan.

  • @baliramkumar3240
    @baliramkumar3240 Před 10 měsíci

    What is different between FIRST PART APPROVAL AND JOB SET-UP

  • @AmanSingh-rg4fn
    @AmanSingh-rg4fn Před 4 lety

    Very important topics for manufacturing industry

  • @jitendrapradhan1598
    @jitendrapradhan1598 Před 2 lety

    Thank you🙏

  • @hariomtripathi5464
    @hariomtripathi5464 Před 4 lety +1

    Nice video sir Please send a sample filled control plan in excel format

  • @QMSDIVYANSH
    @QMSDIVYANSH Před 3 lety +1

    You are Great SIR

  • @souraranjanrath9952
    @souraranjanrath9952 Před 3 lety

    Nice dedicated elaboration of the Format.
    At the Same time Requesting you to please prepare SPC video as related to Electronics industry please.

  • @Pavankumar-ph4bg
    @Pavankumar-ph4bg Před 2 lety +1

    Thanks sir

  • @pradeepsingh-it5oo
    @pradeepsingh-it5oo Před 4 lety +1

    Nice vedio sir

  • @BharatKumar-cz9rt
    @BharatKumar-cz9rt Před 2 lety

    If supplier and design is changing for one part but function is same only esthetic is changed than CP will be revised or not if yes than which things will be changed.....

    • @hemant86211
      @hemant86211 Před rokem

      All things are changed.because part DESIGN are change than again part gone under to DFMEA study & so protype cp are made 1st
      And 2nd one if only supplier change than also all thing are change.... for new supplier coming..

  • @krushnapanda1790
    @krushnapanda1790 Před 4 lety +1

    In one slide you told production CP is made in APQP 4th Phase, in another slide you told Production CP is made before hand over to production both are contradicting if the 2nd line is correct then prelaunch CP will continue till the end of APQP 4th phase

    • @qualitydocumentssolution-q8183
      @qualitydocumentssolution-q8183  Před 4 lety +1

      First of all Thank you for watching
      Production CP preparation is done in APQP 4th phase and before handover to production as per AIAG manual but it will be implemented after handing over to Production.
      During all trial and before SOP at customer end prelaunch CP exists.

  • @cookingwithshravan2356

    Sir pls tell me pilot part kya hota hai

  • @Rockstar-tv6kv
    @Rockstar-tv6kv Před 4 lety +1

    Sir proto type control plan jab hum first piece sample banate he tab banta he kya...

    • @qualitydocumentssolution-q8183
      @qualitydocumentssolution-q8183  Před 4 lety

      Prototype can be made in two phases 1st is design prototype and 2nd is Production prototype and production prototype is made during tool trial.

    • @Rockstar-tv6kv
      @Rockstar-tv6kv Před 4 lety +1

      Sir tool trial ke doran means sample piece hota he na.

    • @qualitydocumentssolution-q8183
      @qualitydocumentssolution-q8183  Před 4 lety

      No, sample part is made during significant Production trial run which is called initial sample as well.

    • @Rockstar-tv6kv
      @Rockstar-tv6kv Před 4 lety

      @@qualitydocumentssolution-q8183 thank you sir ... Clarify my question..

  • @AmanSingh-rg4fn
    @AmanSingh-rg4fn Před 4 lety +1

    Doing very well sir

  • @puneetsharma2522
    @puneetsharma2522 Před 3 lety

    Sir thank you for such an informative video.
    Actually i have doubt related to Prototype control plan. Do we manufacture the part during prototype control plan? And if yes then how many parts are manufactured during this phase?

    • @hemant86211
      @hemant86211 Před rokem

      As per customer demand or very less Qty may be 5 /10 .

  • @aarifsheikh7184
    @aarifsheikh7184 Před 4 lety +1

    Sir IATF 16949 :2016 ki complete vedeo ..bnaye plzz

  • @lokeshpandey8567
    @lokeshpandey8567 Před 4 lety

    How to fill part familiar control plan format

  • @s.schouhan9429
    @s.schouhan9429 Před 3 lety

    👌👌👌👍

  • @hariomtripathi5464
    @hariomtripathi5464 Před 3 lety

    Nice video sir kindly send case study. CP in excel sheet .

  • @BharatKumar-cz9rt
    @BharatKumar-cz9rt Před 2 lety

    This part is introduced to come up from supply issues due to covid19

  • @facts_technology3774
    @facts_technology3774 Před 4 lety

    Sir CP ko review karne ka plan bana skate h ya chahiye

    • @vipinmandaliso2292
      @vipinmandaliso2292 Před 4 lety +1

      As per IATF 16949:2016 Clause 8.5.1.1 (e) review as a set frequency based on FMEA.
      You can prepare review plan as once in a year or twice in a year.

  • @bhavnaacharya2254
    @bhavnaacharya2254 Před 3 lety

    WE REQUIRED CONTROL PLAN FORMAT