Voith rebuild of dryer section Jass Schwarza paper machine PM1 (EN)

Sdílet
Vložit
  • čas přidán 21. 08. 2024
  • In September 2015, Voith rebuilt the PM 1 at the Adolf Jass paper mill in Schwarza / Rudolstadt. The aim of the rebuild was to increase the maximum production speed for low grammages from 1,400 to 1,500 m/min and at the same time maintain the already excellent machine efficiency.
    Results of the rebuild:
    - Productivity increase with the same level of efficiency
    - ‘Clean design’ for improved runability
    - Web stabilization for higher machine speed
    www.voith.com/e....
  • Věda a technologie

Komentáře • 3

  • @bigd4430
    @bigd4430 Před 2 lety

    Qrt is where it is at..

  • @vinayakavalakki3676
    @vinayakavalakki3676 Před rokem

    Given a chance I can do job at the best.

    • @VoithGroup
      @VoithGroup  Před rokem

      Dear @vinayakavalakki3676, please have a look at our open positions on our career website: jobs.voith.com/search/?locale=en_US
      All the best, Your Voith Social Media Team