Video není dostupné.
Omlouváme se.

Statfjord B 1995

Sdílet
Vložit
  • čas přidán 26. 12. 2007
  • Smedvig drilling crew on statfjord B 1995.
    more video's from Statfjord here;
    www.stage6.com/...

Komentáře • 4

  • @365cid
    @365cid  Před 16 lety

    I am not sure what you mean. I think some iron roughneck's could be run manually from a safe area on drill floor. but not on this rig. Anyway everything is changed today. Regards AK

  • @365cid
    @365cid  Před 13 lety

    @shmoab
    Tripping speed in formation must I some cases be carefull because piston effect from bha. Tripping inside csg can be done faster. Tripping fast is not a goal itself.

  • @365cid
    @365cid  Před 16 lety

    This is back in 1995, there was no other option than run it manually. AK

  • @peocaveo
    @peocaveo Před 14 lety

    I W A N T T O W O R K H E R E ! What should I do to get this job. I'm a mechanical engineer, I speak english pretty well and I've nobody waiting for me at home. I should be the first on the list!!!!!!! ;)