Driving the entire Bay Bridge (Both Directions) During Shutdown 200% Real Speed

Sdílet
Vložit
  • čas přidán 29. 08. 2013
  • The drive was conducted at speeds under 25 miles per hour and slower in construction zones. But it has been sped up 200% so you can make the nearly 16-mile drive across the new East Span and the historic West Span, and then back to Oakland, in just under 14 minutes.
  • Auta a dopravní prostředky

Komentáře •