In this video, I’m working on a new large project on a brand new building being built with a very old home nearby. I’ve got some guidelines to follow from Loveland Power that you’ll want to make sure to follow.
DISCLAIMER: This video is not a DIY electrical tutorial. If you need electric work done In your home please contact a qualified professional.
Video date: August 5, 2020
Excellent work. Test the ground resistance with the rods using the fall of potential method once this is done to confirm the quality of grounding.
That's a big expense for Loveland power to pass on to their customers. I guess they'll save money on triplex. I'm a lineman by trade. Urds can be a nightmare on pole transfers or storm damage. Lol. I like the new machine btw!
Hi joshua, could you ask your SEO guy if he can improve your audio so i can hear you as a podcast while im driving. You do an incredible job, we tahnk you!!
You seem pretty good with the code, but you have steel pipe hangers on your PVC after the expansion fitting. Your inspector approved that install? I would think to use PVC approved plastic supports to allow for expansion and contraction.
you sparks wld love trenching pipe in NH dig 4.5 ft down 6 inch of clean fill below and above its fun for an apprentice to dig thru granite slabs
Did you try pounding the rods in vertically and then at a 45 first? You cant just automatically throw them in a trench, code states you must show the first two methods didnt work.
What size wire do I need to from the amp panel off the main house to the adu?