This is how to save $5,000 on Electrical for your ADU

Sdílet
Vložit
  • čas přidán 3. 08. 2024
  • Lower your cost for the Electrical on your ADU by installing a Meter.
    ✅ Need a designer to help you draw plans for your ADU. Natalie can help
    www.heekk.com/adu-plans
    ✅ Get your Free ADU Estimate by a Contractor
    www.heekk.com/freeaduestimate
    ✅ ADU subcontractors for Owner Builder's
    www.heekk.com/adu-contractors
    ✅ This ADU Masterguide will help homeowners build their ADU
    www.heekk.com/adumasterguide
    ✅ For any Real Estate inquiry's please text or call me 818-564-5835
    www.heekk.com/realestate
    ✅ For ADU questions please book an appointment. Please do not call without an appointment. Thank you
    www.heekk.com/contact
    ✅ Natalies Instagram
    ncdesign_st...
    ► LET'S CONNECT:
    ✅ Hektor'sInstagram
    / realtor_hektor
    Hektor
    Los Angeles Realtor
    818-564-5835
    DRE LIC 01881677
    Realty X

Komentáře • 47

  • @bluezcluez315
    @bluezcluez315 Před měsícem +2

    Maybe cheaper up-front but you’re paying for an additional utility service in perpetuity. In Michigan, each utility meter is $8.50 /month just to have the connection. $2000 over 20 years and that doesn’t include any other fixed charges. Will be layout dependent of course, but more utility service isn’t always the answer.
    Additionally, you have solar PV shown - add more of that and energy storage and maybe it could be cheaper to keep the ADU off-grid. Just need some behavior and expectation adjustment - electricity is no longer an endless buffet!

  • @ericvelasquez1282
    @ericvelasquez1282 Před 2 měsíci +2

    Another way is to install a larger than the minimum requirement solar system for the ADU. The ADU then can be completely off grid with the larger system. The the added cost may be $5-10K depend on the size of the ADU minus the cost of running a line form main panel to ADU. Then you can charge the tenant $150/month for electricity. You'll break even in a few years and after that it's free money

  • @czarrevs3616
    @czarrevs3616 Před 9 měsíci

    Great Video Hektor! Thanks for the tip.

  • @limalady1
    @limalady1 Před 11 měsíci +1

    Thank you, excellent tip. I’m waiting for the correction of the floor plans and I can start my project

  • @ebggullette
    @ebggullette Před 26 dny

    Thank you!

  • @allanvillar7583
    @allanvillar7583 Před 3 měsíci

    Awesome 👏 , hopefully I can do this soon 👍

  • @jacksami777
    @jacksami777 Před 6 měsíci +1

    I like your videos right to the point. Now I’m converting two rooms from my home to an ADU what is best for my case regarding the metering?

  • @KJorgensenGroup
    @KJorgensenGroup Před 11 měsíci

    I didn't know you could do that. Thanks for the information.

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci +1

      Call the power company and ask them if you can do a drop. FYI your videos are awesome!!

    • @KJorgensenGroup
      @KJorgensenGroup Před 11 měsíci

      ​@HektorCastillo, I appreciate you for all this information. I still need to discuss this with my wife, lol. Right now, our plan is to have power from the main house with the solar panel.
      Thank you for inspiring me doing this project as a owner-builder.

  • @toro80
    @toro80 Před 11 měsíci +6

    Did this in mine all you need is to pay the permit for a new address witch in my case was 800 dollars in order for the power company to drop the line

    • @Adileneee16
      @Adileneee16 Před 11 měsíci +1

      I think I have to do this for my
      ADU. Is your county LA county too?

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci

      Awesome!!

    • @toro80
      @toro80 Před 11 měsíci

      @@Adileneee16 yes I’m in a unincorporated area and all my paperwork and permits are from la county
      The new address permit was one of the first things I have to pay when I was waiting for approval of my plans and was little over 800 dollars
      All they do is the new address is going to be the same you have in your house plus a 1/2

    • @houmanghasemian3580
      @houmanghasemian3580 Před měsícem

      So I take it the power company doesn't charge power delivery twice?

    • @toro80
      @toro80 Před měsícem

      @@houmanghasemian3580 not to you they are going to charge that to the people who activate the service on the new address your bill are going to stay the same is 2 different accounts

  • @jorgepulidovaladez9418
    @jorgepulidovaladez9418 Před 9 měsíci

    Another great thing about their own meter is the renter can pay their own electrical bill

  • @derekevans7780
    @derekevans7780 Před 2 měsíci +2

    Only way to do it. Im about to do one in a few months. Makes no sense to cone from the main house panel.

  • @adrianromerocodes3211
    @adrianromerocodes3211 Před 11 měsíci +5

    Hector that's awesome info! I'm actually working with Natalie for my blue prints by your recommendation, drop the contact for this electrician please! I'll be needing him soon for my ADU

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci +2

      Adrian hello you will definitely have a awesome experience working with Natalie. I'll try to get the electricians info for you 👍

    • @MercedesCYoung
      @MercedesCYoung Před 11 měsíci +1

      @@HektorCastillo yes, please share his info!

  • @markbelanger2340
    @markbelanger2340 Před 9 měsíci +3

    DWP only allows one service drop per property either to the adu or the existing house.

    • @teraxiel
      @teraxiel Před 2 měsíci

      I was going to comment this as well, because it's the same for SDG&E. It's crazy they allow that in LA.

  • @steveli7530
    @steveli7530 Před 9 měsíci +1

    What about solar. Can you share the solar credit with an independent panel?

  • @edcastillo4456
    @edcastillo4456 Před 9 měsíci +1

    Many newer neighborhoods don’t have overhead lines, but are all underground. Can this same concept work if underground? Meaning, can you run a new line from the street instead of from the existing panel?

  • @rodgea3103
    @rodgea3103 Před 10 měsíci +3

    Does anyone know if LADWP has a distance limit from the pole where the line will be dropped to the new ADU meter?

  • @1966Lucas
    @1966Lucas Před 8 měsíci

    Hey Hektor just to be clear the spot meter is a free service right and we have to pay for the new Panel and installation? is that right?

  • @terukoperalta1076
    @terukoperalta1076 Před 11 měsíci +2

    Aren't ADU suppose to be solar only? Sorry, I don't know much about electrical systems. Do still have to connect with City's electrical system even with solar? Thanks for any info.

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci

      Teruk, Hello not for garage conversion to ADU. New construction ADUs have a different set of rules to follow. Good luck with your project

    • @kawaiisenshi2401
      @kawaiisenshi2401 Před 2 měsíci

      Not in all states

  • @ToughLuckWorld
    @ToughLuckWorld Před 3 měsíci

    Do you have this electricians info?

  • @juanjuarez8163
    @juanjuarez8163 Před 11 měsíci +3

    I thought the power company only allowed one wire from the post for each lot.

    • @ericgutierrez4960
      @ericgutierrez4960 Před 11 měsíci +1

      LADWP only allows one one service line drop per parcel. Not sure what city this house is in.

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci +3

      Juan Hello, call your power service provider and get the correct answer directly from them. One call could save you thousands

    • @Hizenbird
      @Hizenbird Před 11 měsíci +1

      Depends on the power company. “New” options exist now with the advent/popularity of EVs. Some power companies are allowing the dropping of more lines, for example SCE.

    • @AA-eb7sd
      @AA-eb7sd Před 11 měsíci

      That's correct. I am building an ADU in norCal and the electrical company wants only side by side panel in one location with 2 meters next to each other. Not at the location ADU.

    • @leosolis5846
      @leosolis5846 Před 10 měsíci +1

      Yeah unfortunately ladwp only allows one drop per house

  • @HildaRealtor
    @HildaRealtor Před 9 měsíci

    Whats the electricians contact info?!

  • @paulmak1899
    @paulmak1899 Před 11 měsíci

    Is this property in Long Beach?

    • @HektorCastillo
      @HektorCastillo  Před 11 měsíci

      It's in SoCal. For privacy reasons I won't disclose the City 🏙️

  • @ramonreyes1234
    @ramonreyes1234 Před 9 měsíci

    Please be more clear to your people the meter only only meter you still have to pay to install panel and is a 200 amp panel material around 1,200.

  • @bayareaelectical
    @bayareaelectical Před 2 měsíci

    On the same parcel how can you get another meter installed. Is a joke.

    • @HektorCastillo
      @HektorCastillo  Před 2 měsíci

      It's allowed by the power company 🤷‍♂️ and this process saves the homeowner money 💰