QPR asphalt patch not curing

Sdílet
Vložit
  • čas přidán 22. 10. 2015
  • This was a large patch but we followed the instructions, tamping the 2" base then adding a second layer. We also put down plywood, drove over the patch and also set a couple 2000# rolls of paper for two days on the plywood to help compact. After one month you can still easily press into it and cannot drive over it. Made this video to aid in getting a refund fro QPR since Lowes won't refund me.
  • Jak na to + styl

Komentáře • 60

  • @davidp2888
    @davidp2888 Před 3 lety +13

    Legend has it that even 5 years later it still hasn't cured.

  • @squishym
    @squishym Před 7 lety +12

    Ya should have dusted it with Portland, like they recommend in their instructional video when a faster cure is needed.

  • @sarfarazayubgodar5125
    @sarfarazayubgodar5125 Před 4 lety +1

    I had the same problem brother, I did sprinkle the water and stamp it, waited for 12 hours and double coat of drive way sealant. It fixed

  • @davidburlash803
    @davidburlash803 Před 6 lety +12

    I had the same problem. I looked up QPR and they said to dust in some Portland Cement. I did and, it was still soft two days later. On the third day it hardened up. I doubted that it was hard, so I drove my car over it. It was hard. I left now tire marks.
    Try raking it up a little to expose the aggregate. Put about 1/8" of mortar mix , or 1/16" of Portland Cement and tamp the fire out of it. See if that helps.
    Good luck.

  • @govinda102000
    @govinda102000 Před rokem +1

    I used both kinds the same day. This soft patch and the soft patch you add a little water before you tap. This stuff is soft after 2 weeks and the other got hard after 2 days. I will try a sprinkle of mortar or cement mix.

  • @GTAGta-vi5vc
    @GTAGta-vi5vc Před 7 lety +1

    I have learned that it cures fast and great in areas with heavy vehicle traffic. In low traffic areas, it will always have problems curing.

  • @howtodoitdude1662
    @howtodoitdude1662 Před 8 lety +5

    Their video says it can take up to 6 months to cure depending on conditions.

  • @stephengoudie9747
    @stephengoudie9747 Před 2 lety +1

    QPR Is a great product, It will say soft if it is in a low or no traffic area, it needs compaction. Build a crown on the patch and compact it. Dusting it with dry sand or cement will help, It is designed to be soft so it moves a bit, rigid patches pop out and fail.

    • @1995Benzo
      @1995Benzo Před rokem

      Read the info on the website and purchased a bag of sand with the QPR. I should have left a little more of a crown, but the product worked perfectly for me.

  • @angelicajeremy
    @angelicajeremy Před 7 lety +14

    so, cold patch asphalt has a bit of a marketing scam to it. It doesn't really 'harden' for weeks and weeks. It loses its tackyness fast so you can drive on it, but its not hard. Its really only good for holes in flat parts of blacktop that will not have wheels TURNING (moving steering wheel) on it. Any other scenarios ( unless you buy that 45 dollar a bag stuff) you will have problems. Here is what you can do to turn it into something rock hard in 2 days: get whatever brand you want of cold patch. Also buy vehicle strength (high strength) concrete, such as quickcrete Q max or similar, also some asphalt liquid crack filler and some asphalt quick dry skim coat material (latex-tite makes these products as an example you can get it at HD). Now if you are putting this down fresh you can skip the liquid crack filler, but if you have already put it down and need it to harden, then buy the filler. So for those putting it down fresh follow the instruction of the cold patch EXCEPT mix in about 4-5 cups of dry concrete per bag and DO NOT fill patch over the area, fill it level or 1/8 inch under sized. Lay down, compress by running your car over it and then lightly water it (not too much

    • @JP-kl6jl
      @JP-kl6jl Před 5 lety

      I have used it and it worked just fine. It was sunny and in the 90's but it worked fine

    • @tdok
      @tdok Před 5 lety

      Could the patch be sealed after a few days after the cement hardened (let's say a week)?

    • @tomlaz2039
      @tomlaz2039 Před 4 lety +1

      tdok cold patch has extra oils so it stays soft for a long time. It’s really not meant to be a permanent fix and definitely not meant to have pallet jacks or forklifts on it

    • @starpartyguy5605
      @starpartyguy5605 Před rokem

      It will harden in a couple days if you don’t use that iron tamper. Use a 4x4 and hit it until the gravel in the mix breaks down. And only put down 2 inches at a time

  • @Erich1
    @Erich1 Před 4 lety

    You might want to dig that mushy stuff out and replace with a couple bags of fence post concrete mix. Quick, easy, cheaper and stronger than asphalt.

  • @lowlight8466
    @lowlight8466 Před 2 lety

    It can take up to 6 months to fully cure also you should have dusted it with mortar dust and tamped it into the QPR it will help harden the top for a quick use especially going over with a fork truck.

  • @AfroTapp
    @AfroTapp Před 2 lety

    It actually mentions not curing for 6 months, but you should be able to drive over it immediately. It's purposefully moveable to expand dirt and water out.

  • @markstanley7133
    @markstanley7133 Před 7 lety +7

    Heat it up with a propane torch then compact it. It will harden up

    • @FatTailFishing
      @FatTailFishing Před 4 lety

      Does this really work???

    • @vinzklortho3013
      @vinzklortho3013 Před 3 lety

      Yes

    • @chrisiovine1753
      @chrisiovine1753 Před 2 lety

      It worked for me, but it also removed some of the oil so the very top gravel rocks are not sticking. I was told it’s best to heat the product before laying it down. I may slurry coat it now since the product is hard from torching it after I laid and compacted it down.

  • @bellad.1274
    @bellad.1274 Před 4 lety +1

    😊Thank you for posting. Can you give us a follow-up ?? how did you fix your asphalt problem? How did it turn out? I am having the same issue ! 😕

    • @JnJShiffler
      @JnJShiffler  Před 4 lety +5

      I actually remove the stuff and was supposed to get a refund but that check never came and then just filled in with high strength concrete

    • @bellad.1274
      @bellad.1274 Před 4 lety +1

      @@JnJShiffler Hi! I really appreciate you getting back to me. Thank you.😊 I might have to replace mine too

    • @sebykuriakose7004
      @sebykuriakose7004 Před 2 lety

      I wasted money too. Mud is better than this garbage

    • @1995Benzo
      @1995Benzo Před rokem

      @@sebykuriakose7004 it worked GREAT for me, but I dusted it with sand before tamping. 1 year later and no problems.

  • @LaserFocused
    @LaserFocused Před 5 lety +8

    Cement powder brother and it will arden in 24 hrs

    • @Floridamanfresh111
      @Floridamanfresh111 Před 4 lety

      Wait. What do you do? I'm having the same issue. Like quickrite and just sprinkle it on?

  • @robertbuck7186
    @robertbuck7186 Před 2 lety +1

    Try putting a piece of junk plywood over the area that you travel over it and leave it their.... Its not pretty but will give the mix more time to cure... These cold mixes are not the greatest...I have filled potholes with the various cold mixes that are sold in bags and buckets... some are good and some are junk that still stays tacky and easily become depressed and indented and pushes up areound the sides of the wheels when you park directly over them on or if a heavy wheel should displace when traveled over...like a pallet jack wheel...on our potholes At the foot of the driveway I have found that no matter how well I tamped when a car dorve over it shortly after it would get displaced and pushed down in the area. but if you leave the plywood iover them for about a week it gives it more time to cure... you can apply water to the top of them as per instruction if the directions call for it and say that "it helps harden it" but with that pallet jack situation and that area why dont you just get a piece of diamond plate and put it over the patch to level it and leave it there... that shoud take care of your problem... (just a suggestion)

  • @bellad.1274
    @bellad.1274 Před 4 lety +1

    Thank you for posting.

  • @keithpetorak7177
    @keithpetorak7177 Před rokem

    Did you put it down in 2"increments and then back it down?

  • @raywalteroutdoors
    @raywalteroutdoors Před 3 lety +1

    Mine took a couple days then it was hard as shit its still there 4 years later with no issue. If it wasn't dry after months I'd re bag it and take it back to lowes.

  • @bigcatdaddy7573
    @bigcatdaddy7573 Před rokem

    Get a tamper at Lowe’s and put some mortar on it, then tamp the heck out of it.

  • @BurtBowers
    @BurtBowers Před 3 lety +2

    Another reason not to use bagged ashpalt..

  • @Mihogan
    @Mihogan Před 4 lety

    You didn't tamp it enough. Mine was harder an hour after I did mine than yours is months later..

  • @brightchange6065
    @brightchange6065 Před rokem

    I'd be MAD!!

  • @jbkahl
    @jbkahl Před 7 lety

    Look into Aquaphalt

    • @angelicajeremy
      @angelicajeremy Před 7 lety

      i think this is the 45 a bag stuff, i heard its awesome buts its 4 times the cost. see my above method. not sure where you can buy this either, may need to specialty order...

  • @ryanbruh752
    @ryanbruh752 Před 2 lety

    Looks like cold mix. Temporary.
    Need hot mix for solidity solid enough for a truck in 1hour

  • @chasrock68
    @chasrock68 Před 5 lety

    Assault is cheaper and easier to use. Don't fool yourself thinking this is a great fix. A ton of blacktop is only about $55 to $60 at the most. You'll pay more for cold patch by the bag or ton.

  • @blckspector
    @blckspector Před 3 lety +2

    Same problem,this product is awful it should be free.

  • @0ex3ex2
    @0ex3ex2 Před 4 lety

    QPR fc

  • @sebykuriakose7004
    @sebykuriakose7004 Před 2 lety +1

    This is garbage. Don't buy it. Last week I bought six bags to fix the edge of my driveway. But all gone after two days by rain. It's totally waste of money and waste of time.

    • @tikakahn2521
      @tikakahn2521 Před rokem

      I was looking into this to apply on the driveway side edging where it runs parallel to the grass. I am leaning towards AquaPhalt but dang it's expensive.

  • @carlosbarajas7582
    @carlosbarajas7582 Před 7 lety +3

    dont buy qpr. i work at quikrete... if u need help message me

    • @jbkahl
      @jbkahl Před 7 lety +2

      Don't use quickrete either, it becomes a brick in a bag in the winter

    • @MadbencoFS
      @MadbencoFS Před 6 lety +2

      QPR works just fine.

    • @williamhoskins3053
      @williamhoskins3053 Před 5 lety

      Carlos Barajas HELP me the quikcrete asphalt repair I put down won't harden

    • @gr8tfuldad670
      @gr8tfuldad670 Před 5 lety +1

      @@williamhoskins3053 Any luck getting the quikrete to harden? I did the "tamping / plywood / drive over it" routine, and it's still like oatmeal 36 hours later. Suggestions?

    • @gr8tfuldad670
      @gr8tfuldad670 Před 5 lety +1

      Carlos: I used a 50 lb Quikrete bag. I did the "tamping / plywood / drive over it" routine, and it's still like oatmeal 36 hours later. Suggestions?

  • @0526FREDDY
    @0526FREDDY Před dnem

    Garbage