Building In Ghana, House Tour of A Three Phase 110V And 220V Electrical Wiring In Accra.

Sdílet
Vložit
  • čas přidán 31. 07. 2022
  • This is a full house tour of a three phase 110V and 220v electrical wiring. no need worrying where to connect your 110V electrical gadgets or equipments in your home in Ghana, you have the 110V outlets right here, thanks to Multi Skilled Electrician and his hosts of professional and registered electricians.
    Locations: Cape Coast and Accra
    WhatsApp: 00233245343796
    kindly subscribe, like, share and don't forget to contact us for all your electrical installations and maintenance services.
  • Věda a technologie

Komentáře • 11

  • @multiskilledelectrician1

    Do you Live in the US 🇺🇸 or Canada 🇨🇦 and building in Ghana? Don't worry about the power supply or system. Vicarriet Electricals will take care of your electrical needs. We're specialised in single and three phase residential and commercial electrical work, we do both 220V(Ghana power supply) and 110V (US and Canada) power supply. You can contact us for anything electrical and also as professionals we have the hand, power tools 🔧, and measuring instruments to serve you efficiently. One more thing, all our electrical services conform to the Ghana Electrical Wiring Regulations 2011, (LI 2008)
    We offer you safety and value for money.
    Location: Adjiringanor, Accra and Cape Coast
    WhatsApp: 00233245343796
    00233209787770

  • @ukdaily5136
    @ukdaily5136 Před rokem +2

    Great job 👏

  • @sandraasareamankwa2240
    @sandraasareamankwa2240 Před rokem +2

    What will be the average labour cost for wiring a 5 bedroom story building?

    • @multiskilledelectrician1
      @multiskilledelectrician1  Před rokem

      Good morning Sandra, kindly WhatsApp or text me on this number
      0245343796
      0209787770
      There are some information I need to know to come up with a workmanship quotation or electrical materials list, thank you.

  • @BrightandClara
    @BrightandClara Před rokem +1

    Thanks for sharing but your 110KV circular box is not the 110kv type.

  • @TheWaytoHoliness
    @TheWaytoHoliness Před rokem

    The workmanship is not good. The switches and socket cutouts are levelled differently as well as centering, the trusses have inadequate ties and struts, the spans are too long not to have structural support, timber is not treated. Windows and door levels are different.

  • @hagan_andrews2
    @hagan_andrews2 Před rokem +1

    Can we work together