Lightning Arrester Installation for Solar System | How to Install Lightning Arrester | Solar Energy
Vložit
- čas přidán 22. 03. 2023
- For solar installation, commissioning and consultancy services please contact us:
Ibrahim Engineering
Engr. Aamir Shahzad
0332 8727467
0345 4170005
nice info
You have good knowledge and this is the correct way of installing lightning arrestor👍 Most installers do not use insulator and directly put rod on roof or on pole. I have also seen lightning arrestors installed in the middle of panels 🤣 at a height which is lower than panels. Allah aisay installers sey bachaye jinko apnay hi kaam kay baray mein nahi pata.
Good job
Weldone
❤❤❤
Building m oper se nichy kisi pvc pipe main lana he????
Brass he ya copper??
chi maloomat
Is it enogh to attach 4mm wire?
During rain the wood insulator will be wet and will be a conductor. Please consider insulator pedals in future.
We already used a plastic insulated sheet between the wood piece and the conductor for rainy days.
Nuts and bolts are making connections between copper and pipe 😂
Someone installed Longi HIMO6 panels at 6 degrees in Lahore. I think he did fraud. He said HIMO6 is supposed to be at this angle in Lahore. Is that correct? I doubt it. Pleaes tell me is it worth it for me to get it fixed by altering the structure angle? Also I need my lightning arrestor fixed.
No no it is literally flat check correct angel for Lahore on google
Cost?
Cost ?