The Worst JOB I Have EVER BEEN TO - Electrician

Sdílet
Vložit
  • čas přidán 24. 02. 2022
  • Here we have a delightful build a special something that I've never ever seen before it's bad
    link here for Tradify for 50% of 3 months. bit.ly/3HEISts
    Use code BUNDY25 at unilite.co.uk/product-categor... for 25% off
    Use code BUNDY10 at www.expertelectrical.co.uk for 10% discount
    Join this channel to get access to perks:
    / @nbundyelectrical
    This video is for entertainment purposes only and is in no way intended as a guide or 'how to'.

Komentáře • 383

  • @henryeadie7972
    @henryeadie7972 Před 2 lety +55

    Hager Board and 2 car chargers, sure Artisan hasn't been there? 😂

  • @grahamcole4240
    @grahamcole4240 Před rokem +14

    I did my apprenticeship starting in 1968 and in all my years as an electrician I have never seen such a bloody mess as this.. Well done sorting it out.

  • @sparkequinox
    @sparkequinox Před 2 lety +67

    How anyone this incompetent actually gets the thing to work at all, is impressive.

  • @tazdevil875
    @tazdevil875 Před 2 lety +23

    Well, on the plus side, the plumbers pipe work is nice :-)

  • @AndyFletcherX31
    @AndyFletcherX31 Před 2 lety +28

    I really hope there will be litigation. The builder is responsible for damage to the existing installation and a complete rework of the kitchen etc. Unfortunately, they have probably gone bankrupt!

  • @Ampex196
    @Ampex196 Před 2 lety +20

    It's what we would call, in the old days, 'a bugger's muddle'.

  • @cranefamily
    @cranefamily Před 2 lety +10

    I am sure Dave would have got more satisfaction helping sort out that mess, than a beer in his right hand or maybe not 😂 great work guys

  • @steve11211
    @steve11211 Před 2 lety +11

    Wow, well done.. I think I would have taken a quick look at that lot and just said rewire cause god knows what else is hiding under the floorboards...

  • @garythespark6295
    @garythespark6295 Před 2 lety +2

    Finally a title that lives up to its name. 2 minutes in and it’s completely justified.

  • @dylanshenton6001
    @dylanshenton6001 Před 2 lety +4

    What a state that was, props to you both for making it all safer. A great example of keeping your cool and working your way through the s***

  • @doomain6769
    @doomain6769 Před 2 lety +27

    All the Qualifications and requirements for good honest electricians to have, update regularly, pay for annually, to be deemed competent to do domestic work. And then there's the people with nothing that get these jobs and make a right mess of someone home.

  • @stuartthespark
    @stuartthespark Před 2 lety +32

    Adam, don't go putting your hand into a live board or touch random cables use a long nose insulated pliers if you want to move a cable.

  • @prolecelectricalservices3813

    And for the record…….CPC’s must be connected through, regardless whether it is a class 2 fitting or not. Anyone who says different needs to continue with their education.

  • @jayAsparks
    @jayAsparks Před 2 lety +3

    I hope you are on a day rate for this fine bodgery. You will keep finding bodges the deeper you dig. Fair play for taking this work on though lots will turn straight back out the door.

  • @dishydave1819
    @dishydave1819 Před 2 lety +2

    Last time I saw anything quite that bad it was a neighbour whose husband had replaced their Consumer Unit himself just before he left her. Amongst many many faults he'd left was a fabulous (sarcastic!) situation where two different MCB's switched off the Boiler and Central Heating ... one was a 32, one was a 16, both had 1mm cable to them, and both had to be on for the CH and boiler to work. Heaven alone knows how on earth there had not been a fire or someone electrocuted. It was only discovered when the pumped shower mixer would not turn off and it was found that there was no isolator (or fuse) on the shower pump supply and the only way to switch if off was to knock off the mains. Turned out the shower pump was being supplied from a 13a plug into a 'floating' socked under the floorboards on the ring final circuit. Anyway, fab video as always, Happy Birthday for last week Adam and keep up the fab work both of you. 💯💯💯

  • @chrisrodriguezenator
    @chrisrodriguezenator Před 2 lety +1

    All that intro needs is Dave Savery in the corner waving his fist while ranting about kitchen fitters, surprised any of that mess actually works!

  • @steveb1856
    @steveb1856 Před 2 lety +8

    Best argument against dual RCD boards, allows total bollocks but will still work, should be mandatory to fit full RCBO boards!

  • @andyxox4168
    @andyxox4168 Před 2 lety +1

    I’m loving the fact that there are two open pipes with isolation valves right above the consumer unit …

  • @andrewcadby
    @andrewcadby Před 2 lety +11

    35:35

  • @haydenuk02
    @haydenuk02 Před 2 lety +23

    Wow that’s a right mess. This is definitely a prime example of why you shouldn’t ever let builders do the electrical work. I’m no spark I’m a mechanic but I’m sure I could have done a better job than that builder did. Brilliant and quality work as always Nick and Adam and thanks for sharing this with us take care