Dr Martens shoes cabinet step 7 : LED and Epoxy integration in plywood

Sdílet
Vložit
  • čas přidán 8. 09. 2024
  • During this step i have inserted an LED Strip in the top of the cabinet.
    First i have made an opening in the plywood of 6mm, the fill it with with epoxy with some droplets of white pigments. After 36h, i have made a slot on the other side with a depth of 13mm in order to reach the epoxy.
    For the led installation, i have prepared a stop/cover to support the led and to finish the top of the cabinet.
    As always the main work was done with the shaper origin.
    Enjoy.

Komentáře • 1

  • @oscarfox
    @oscarfox Před 3 lety

    Nice! I was thinking about the same thing for my new kitchen cabinets. Thanks! Just a little long. I had to saw it on 2x speed. Try to do some close ups next time. Best regards from Perú!