(Eng Ver.)WorldSkills Electrical Installations 10

Sdílet
Vložit
  • čas přidán 16. 08. 2024
  • Cable pulling & connection 00:00
    00:28 Introduction
    00:45 Main focus of the task
    Supplies
    Protective equipment
    Precautions
    03:02 Performing tasks
    03:22 (1) Identify the location and direction of cable pulling
    04:04 (2) Place cables (main circuit, auxiliary circuit, communication cables)
    07:25 (3) Fix cables with cable ties
    09:43 (4) Connect cables to the devices according to the drawings
    14:57 (5) Prepare and attach labels
    15:37 Key points summary