Mambaling SOUTH BOULEVARD update,😍 Bored Piles installation is done!

Sdílet
Vložit
  • čas přidán 29. 08. 2024
  • On April 24, and 31, 2024 , I've been there for two times for my monitoring purposes for the two projects: SRP backroad concreting project and the Mambaling South Boulevard. Before my vlog formed I was there at the back of South Coast City, where we can find the SRP backroad concreting project, there has a big changes, the two lanes of concrete is reaching already at Mambaling old bridge. They are done also making the gutters together with mini pathway at left side, based on the video I've made, we can see there that there are a lot of surprises for us to witness the huge accomplishment. Same also in Mambaling South Boulevard, maybe we will say this project is too slow, but not like that, the reason why this project is not fast is because of the materials dilevery is very slow. But don't mind that problem, the good thing to know is that, the installation of bored piles is done, meaning to say the 12 bored piles are complete. The girders are ready to build a strong bridge, but lack of materials to fix it. Soon if the workers will arrive together with materials and equipments this project will goon.
    #singaporelikesugbo
    #cebuphilippines
    #MambalingSouthBoulevard
    #southcoastcity
    #SeasideArena
    #southroadproperties

Komentáře • 4

  • @fd111e2
    @fd111e2 Před 3 měsíci +1

    Kini ang ako gihuwat! Salamat boss Jenkie!

  • @daydream2277
    @daydream2277 Před 3 měsíci

    Nice update dol unta mahuman agad para naa nay mga diversion road bawas sa traffic

    • @Singapore-LIKESugbo
      @Singapore-LIKESugbo  Před 3 měsíci

      Oo gamay nalang, foundation tapos ipatong raman ang mga girders, then slap.. Dali ra kay precast naman na

  • @fd111e2
    @fd111e2 Před 3 měsíci +1

    Ahak, wala pa jd diay ma fabricate ang mga pierheads. Murag natanggong ang mga girders diha.