Laying 4'' Tile with a Soil-Max ZD-48 Stealth Plow

Sdílet
Vložit
  • čas přidán 12. 01. 2020
  • Properly installed tile can greatly improve farmland production. This video shows installation of 4" tile with a Soil-Max ZD-48 Stealth Tile Plow.
    Produced with CyberLink PowerDirector 18

Komentáře • 7

  • @brianfitzpatrick8448
    @brianfitzpatrick8448 Před 2 lety

    Thanks for the video. Great job

  • @stevefife6399
    @stevefife6399 Před 3 lety +11

    Skip the music, it’s annoying.

  • @katrinaanon1038
    @katrinaanon1038 Před 2 lety

    what weight and horsepower was require to put that line in?

  • @MrObvious333
    @MrObvious333 Před 2 lety

    There is a much better way to do tie-ins. As is being done here, the
    open trench that the excavator makes offers virtually no side support
    for the pipe due to the width of the trench and no groove to provide two
    point support for the pipe. If you've ever dug one up after a couple of
    years. you can se that the pipe is deflected 30-50% causing as
    significant loss of capacity.