Model Railroad Yard Design

Sdílet
Vložit
  • čas přidán 7. 04. 2023
  • What are the essential features of classification yards on model railroads? That’s what we talk about in this video.
    This is the first in a new series of videos about my classification yard at Green River. It covers the yard design on my layout as it currently exists. I discuss the essential features - and some optional features - that I included, or didn’t include, in the track plan for the yard.
    Support this channel via PayPal
    www.paypal.com/paypalme/UPEva...
    DJ's Trains
    / @djstrains
    Glenn Campbell's drone video
    • Green River, Wyoming -...
    Sarunit63's drone video
    • UPRR Green River fligh...
    NMRA Freight Yard Design
    www.nmra.org/sites/default/fi...
    Crown Oil & Gas playlist
    • Crown Oil & Gas
    My videos page
    www.youtube.com/@n-scaleunion...
    Our Facebook group
    / 724442657753901
  • Zábava

Komentáře • 142

  • @TotoMacFrame
    @TotoMacFrame Před 13 dny

    I hope you have people telling you that you are actually pretty cool from time to time.
    You spread not just knowledge but good vibes as well.
    Thanks for the video and the information, appreciate it a lot!

  • @carlmiles8655
    @carlmiles8655 Před rokem +4

    Hello Roy Happy Easter to you and Leonore now all we need to do is have a COFFEE AND DONUT SHOP on your layout ;-)

  • @openeyes-411
    @openeyes-411 Před rokem +3

    Excellent points Roy - looking forward to the rest of the series!👍

  • @schadowolf
    @schadowolf Před 2 dny

    Great video and very informative! Glad YT recommended this video, subbed.

  • @randymcneely4983
    @randymcneely4983 Před rokem +1

    👍For the track plan. 👍👍For the smooth camera work. It's like watching DJ's drone videos.

  • @homer128
    @homer128 Před rokem +1

    Good stuff, Roy. A yard is going to figure heavily into my track plan, so I really appreciate the timing of this. Thanks!

  • @Perfusionist01
    @Perfusionist01 Před rokem +1

    Nice work. I need to watch this again to make sure I get all your info.
    Thanks!

  • @WhatAboutTheBee
    @WhatAboutTheBee Před rokem +2

    Welcome back Roy! Well worth the wait. This is going to be a good series!

  • @jaybickford512
    @jaybickford512 Před rokem +2

    I really learned a lot from your video, Roy, and am looking forward to seeing your future installments. Keep 'em coming! 👍

  • @kimrok1
    @kimrok1 Před rokem +4

    Idea for the crew change time out. Isolate the portion of main tracks in front of the yard office. Put a sensor and timer, train comes in power to the block dead, timer times out, power goes live and trains move on.

  • @seanspennywisemiserrr
    @seanspennywisemiserrr Před rokem +2

    Very informative, Roy. Thank you for explaining the different aspects of a yard. Take care. Sean.

  • @eaglerocknscale2936
    @eaglerocknscale2936 Před rokem +2

    GREAT to see you back..Looks like a good plan... ironically I submitted a plan ( wish) ( suggestion) to Kato to create (re-engineer) the # 6 turnout. This would make the diverging create a double track spacing of 33mm( like the # 4 turnouts )

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Great suggestion to Kato. I wish they would do that, and I wish they would expand their selection generally. ...Roy

  • @allenbarnes7202
    @allenbarnes7202 Před rokem +1

    Glad you are back, keep up the great videos.

  • @mrkattm
    @mrkattm Před 3 měsíci +1

    Looks awesome and lots of great info, one thing I noticed is that those trains move very slowly, I remember when I was a kid mine trains could really move, I guess that they just don't make them as good as they use to. Still fun to watch !

  • @ronaldrondeau7870
    @ronaldrondeau7870 Před rokem +1

    Great to see you back Roy, great prrsentation, There is always place to improvement on a layout, so dont give up, whaitng to see more, Easter party on the way

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      I guess that's why a layout is never done. Thanks for watching and commenting, Ronald. Happy Easter to you, too. ...Roy

  • @TheNorthwestWind
    @TheNorthwestWind Před rokem +2

    youre the man Roy

  • @jbmorrow5390
    @jbmorrow5390 Před rokem +1

    Thx as always - glad to see you back!

  • @markwilson8002
    @markwilson8002 Před rokem +2

    Excellent as im a UK modeller & just starting to get into the US scene this is an excellent & clear explanation. Ive watched quite a few videos & still been slightly confused but this is brilliant. I also love DJ trains, thank again i have subscribed..

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks, Mark. It seems like there's a overwhelming number of videos on any aspect of model railroading. Always more to learn. ...Roy

    • @ChicagoSubNScale
      @ChicagoSubNScale Před rokem

      Mark, where in the UK are you? I’m also from there…I’m currently VP of the NMRA British Region and I model modern outline BNSF in Chicago. Peter

  • @trainmanbob
    @trainmanbob Před rokem +1

    Excellent video Roy, for which thanks. Happy Easter to you all. Cheers, Bob

  • @newhavennscale
    @newhavennscale Před rokem +1

    Excellent update, Roy. I really enjoyed it.

  • @adriengadson3544
    @adriengadson3544 Před rokem +1

    Good information on yards and the leads. Also good explanation of the use on your layout that is a compressed version.

  • @robtman9199
    @robtman9199 Před rokem +1

    Very nice Video Roy, you have fit so much into the space you have. Always a treat to see trains running with a purpose on your RR. Hope you are doing well, Best to you, Leonor and your Mom, stay safe.

  • @charlesmcclure5994
    @charlesmcclure5994 Před rokem +1

    Great video Roy and a lot of useful information about yards guarantee I will be following along with each new 👍👍

  • @tim_bbq1008
    @tim_bbq1008 Před rokem +1

    wow Roy, That was a lot of information about classification yard tracks. Thanks for sharing!

  • @IKARNIFEX
    @IKARNIFEX Před rokem +2

    Happy Easter , Roy! Great video. Helpful tips.

  • @joesestito4342
    @joesestito4342 Před rokem +1

    Roy, another great and informative video. Thanks for taking the time to make and share your videos and research with the model railroad community. ….joe

  • @stephenriley9084
    @stephenriley9084 Před rokem +1

    Roy, Back on form! Great video. Regards Stephen.

  • @randygates364
    @randygates364 Před rokem +1

    Excellent and very informing. Timing is great for me as I’m currently building a classification yard. I’ll be making a few changes thanks to you!

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks for your comment, Randy. It's amazing how often the information we need shows up just when we need it. What a hobby! ...Roy

  • @theubaum
    @theubaum Před rokem +1

    Roy, as usual another great video! Thanks! Happy Easter!

  • @gregbowen617
    @gregbowen617 Před rokem +2

    Great to see a new video from you Roy! Unfortunately Kato Unitrack is limiting because of its geometry. Because of that I used Peco track and turnouts (Medium Radius) for my yard with a double slip switch allowing me to enter and exit from four directions. Regarding the automation - DCC-EX would allow you to do the required stop without you having to manually control it - maybe get in touch with Fred Decker from DCC-EX and see what he can come up with - I think you could do it with a DCC++ setup using an Arduino, motor shield and WiFi board, plus an EX-Rail script. Fred should probably be able to help you further. Look forward to your next Vid. Cheers from Melbourne, Australia.

    • @openeyes-411
      @openeyes-411 Před rokem

      Greg, are the Peco turnouts #5 frog by chance? If so, they're probably every bit as reliable as a #6 - and may be just the trick here for Roy.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks for your comment, Greg. I really like Kato Unitrack, but I do wish Kato would offer a greater selection of turnouts. Thanks for your suggestion regarding automation. I must admit I'm baffled by Arduinos. I'm continuing to work on this matter of automatic stops for crew changes, which I imagine would work just like station stops. ...Roy

  • @lynnmccurdythehdmmrc2561

    Great Video, always enjoy seeing your Videos and hearing what you have to say.

  • @davestrains6816
    @davestrains6816 Před rokem +1

    Great video Roy. Very informative. Thanks for sharing. Dave

  • @tanzj
    @tanzj Před rokem +1

    Well done Roy....John

  • @MrBsHiawathalandRails
    @MrBsHiawathalandRails Před rokem +1

    Great video Roy as always.

  • @stevencollins1643
    @stevencollins1643 Před rokem +1

    Really great info! Thanks so much!

  • @SmithOfGear92
    @SmithOfGear92 Před rokem +2

    14:54 Roy, don't say that! You did your best with what little space you had. Sometimes compromises must be made.

  • @dave3301
    @dave3301 Před rokem +2

    Thanks for sharing..

  • @seanpacificrailroad3700
    @seanpacificrailroad3700 Před rokem +1

    Hi Roy, it’s great to see you again and great video. I always been fascinated with rail yards, I wish mine could’ve been a little more complete all the through instead of dead stop. Next layout I build it’s going to have a full yard 👍😀

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      You're right, Sean! Rail yards are fascinating spots, both on the prototypes and on our layouts. So much going on there! ...Roy

  • @dacuzzz
    @dacuzzz Před rokem +1

    hello Roy... great info on this video... thx 4 sharing... vinny

  • @kentfredenberger615
    @kentfredenberger615 Před rokem

    Superb!! Thank you! 👏🏻👏🏻👍🏻

  • @lloydb6637
    @lloydb6637 Před rokem +1

    As usual a great and informative video, thanks.
    Personally I'm not really into operations and don't have a classification yard. I am into automation and continuous running, so I use detection and iTrain. This is a way you will be able to automate a stop for the crew change, but it isn't easy, or cheap!

  • @christopherorourke6543

    Great video Roy. The explaining of freight yard and lead tracks, arrival/departure tracks and strategizing on doing it is great.

  • @TGsports_Free2watch
    @TGsports_Free2watch Před rokem

    Very helpful video as I plan out my NECR layout and definitely don’t know much about track planning but enjoy yard operations.

  • @johnathanlewis2049
    @johnathanlewis2049 Před 7 měsíci

    Hi Roy. You have a beautiful layout.
    I live in Southwest Pennsylvania
    North of where I live is Connellsville Pennsylvania.
    Connellsville was a big B&O facility. Now It’s CSX territory
    There are 2 yard lead tracks that come into the yard adjacent to the main line.
    Yes yard lead tracks are very important and it’s not good to foul them
    Have a great day!!
    By the way - DJ’s Trains is an awesome channel.
    He lives and works here in Western Pennsylvania for CSX.

  • @stephenrickjr.7519
    @stephenrickjr.7519 Před rokem +1

    Great explanation 😊👍.

  • @johnwayneaquaria8770
    @johnwayneaquaria8770 Před 8 měsíci

    Thank you so much, it was extremely well explained and is helping me to design my yard as we speak 🙂👍

  • @garykcs5532
    @garykcs5532 Před rokem +1

    I really hope you guys had a great Easter I was a great video that you did I'm very lucky to have 12 and a half feet for my yard with nine classification tracks with switches on both ends but I know your pain I used to have a layout that has small area for a yard and it's very hard to work with. I'm excited to see what you're going to do next. Somebody did ask me to do a short video on my yard a couple weeks ago and that's coincidental that you're doing one now on yours. Anyhow keep up the great work and we'll be waiting for the next video. Gary

  • @craiglordable
    @craiglordable Před rokem

    Thanks Roy, I have watched this a couple of times, and my yard has the right stuff. I will use it for awhile before I out any ballast on it to make sure it is functional.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Craig, I think that's a really good idea: I mean, running your trains for a while on your layout before ballasting the track. That way, you can be more sure of your track configuration and placement, before "permanently installing" the track by ballasting it, after which I becomes more challenging to make changes in the track. ...Roy

  • @clayton4115
    @clayton4115 Před rokem +1

    Very good points, even I had problems (derailments with kato #4's) and reverted to #6 for better operations.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks for your comment, Clayton. Your experience explains very nicely why I’d prefer to stick with #6’s. …Roy

  • @IronHorseRailways
    @IronHorseRailways Před rokem

    Hey there Roy!
    Lovely video, thanks for taking the time to create it - I've hit that sub button!
    Now, I'm an English railway modeller, but have always had an appreciative for the way you folks do the railroad thing - so this last two weeks I've taken a dive and purchased some US outline locos and stock in HO and am joining the action with a planned build of a fictional desert-themed switching layout - we have even less space than you do over here 😂
    Thanks again!

  • @chazco
    @chazco Před rokem +1

    Howdy Roy, I was thinking (uh oh) about the car repair shop. If it open on both ends you could create the loco run around going out to the Yard Lead.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      That's a great idea, my friend. I just wish I had more room at the back of the repair shop so that I could squeeze in the tracks. ...Roy

  • @mikehowey4869
    @mikehowey4869 Před rokem +1

    Very interesting video,I happen to be working on my class yard now.I want to have my class tracks double ended but I don't believe I have enough room.Wondering how prototypical this is? Looking forward to part 2!!

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      Thanks for your comment, Mike. Double-ended classification tracks are definitely better and more prototypical. But turnouts at both ends does take a lot of layout space, and naturally that's why most model railroaders settle for stub-ended classification tracks. ...Roy

  • @williamstewart4620
    @williamstewart4620 Před dnem

    Enjoyed this fun and informative video. I'm late to the party but I'm wondering if you eventually changed your #6 turnouts to #4 turnouts and if so, how did it turn out?

  • @chrisbarr1359
    @chrisbarr1359 Před 9 měsíci +1

    Excellent video! New subscriber.

  • @gerdeguelle1967
    @gerdeguelle1967 Před rokem

    A very nice video

  • @robertweinberg4449
    @robertweinberg4449 Před 5 měsíci

    Thanks!

  • @TheTrainFreak
    @TheTrainFreak Před rokem +1

    Great video Roy! There is an old book by Model Railroader that is no longer in production that is a great guide to freight yards. I will send you a private message with a link to that book. If you have an open ended yard and not stub ended, each classification track could also become a departure track as well. Also for selective compression, using 3 way turnouts and single/double-slips can help lengthen or add more tracks. As for the crew change, might contact Iowa Scale Engineering and ask about their Motorman. You could add #6 turnouts on the yard tracks and make a compound ladder to add tracks between your current tracks. Just a few suggestions. Have a great one! - Jason

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks for your comment, Jason. It's always good to hear from you, and as always, I appreciate your suggestions. I will continue to look for that book, and - who knows? - I may eventually find it. I am continuing to think about changes that might improve the classification tracks in a way that would reduce the spacing between the tracks and allow me to add one or more additional classification tracks. Thanks for suggesting Scale Engineering, I will check it out, because those stops for crew changes absolutely must be automated. ...Roy

  • @user-gk8gg1zt7l
    @user-gk8gg1zt7l Před rokem

    Good video, like.

  • @MMRails
    @MMRails Před rokem +1

    Excellent video Roy! Great explanation of the tracks in a yard. I have one question. When your switcher brings a car into the yard lead to build the train, how does it get out without a run around track? I may have missed something. Oh wait.. does it drive into the yard lead and then back up to pick up more cars? That makes sense. Did I answer my own question? Thanks Roy! Lol.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      You got it, Mark! You answered the question. For the yard switcher, it's back and forth, back and forth, and still more back and forth. ...Roy

  • @dkaustin98
    @dkaustin98 Před rokem +1

    Nice video. Question. At 23.20 you have your uncoupling stick laying between two switches. What about a double slip on both sides of that stick and a piece of track running between the two. That would give you an engine runaround for a lone car going to the shop.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks, my friend. I'm still looking at ways to do a run-around track. Of course, I use Kato Unitrack, and Kato doesn't make any double slip switches, but I'm working on that problem. ...Roy

  • @bcsferromodelismo3822
    @bcsferromodelismo3822 Před rokem +1

    🇧🇷🚂👏🏻👏🏻👏🏻👏🏻👏🏻👏🏻
    Very nice video!

  • @michaelmorgan7893
    @michaelmorgan7893 Před rokem

    Looks great, Roy. I want to attempt a 1970's era yard scene of Barstow, but with limited space, I will only be able to do my best to roughly represent it. Even if I freelance the yard/town, I'll try to catch the flavor of a Santa Fe yard operation.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      Thanks for your comment, Michael. I think that's just about the best that we can usually do: that is, capture the essence - or represent the prototype - in the limited space that most of us have for our layouts. ...Roy

  • @genejablonski9909
    @genejablonski9909 Před rokem +1

    Roy, thank you for all this important information. It sure helped me understand yards and their functions. BTW, what do you use for the lines on your highways?

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      Thanks, Gene. It's always fun to share the world's most amazing hobby. For highway lines, I use the Highways and Byways product. It's so much better than any other way of doing the lines that I know of. ...Roy

    • @genejablonski9909
      @genejablonski9909 Před rokem

      @@n-scaleunionpacificevansto6569 Thanks for that info Roy. I'm happy to see you back and am looking forward to the next installments of this series.

  • @greatnorthernrailwaytother4711

    Hi. Enjoyed your analysis of your yard. Is it possible to customise the standard switches to shorten the amount of straight track between your turn outs. The photo of the prototype looks to have the next switch starting almost at the frog of the previous switch. Cheers Peter.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      You're right, Peter, It may be possible to modify Kato turnouts, but I've never done it. I"m continuing to think about this. ...Roy

  • @petesilcox4102
    @petesilcox4102 Před rokem

    I was in the Engineering Dept of CSX and every yardmaster was always wanting another crossover , more tracks, longer tracks, but when the the cost estimate arrived, they had to contended with the had. Same with model RR. Fueling thru trains , get a fuel servicing truck and access road along main tracks. Consider installing a second turnout on each class track to fill the wide gap between existing class tracks, this will shorten both tracks but give additional sorting tracks a nd justify the cost!

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      Thanks for your comment, Pete. I appreciate it. In response, let me mention that I'm considering replacing the No. 6 turnouts on the yard ladder with No. 4 turnouts. After all, that wide space between the tracks is caused by the geometry of Kato No.6 turnouts. No. 4 turnouts don't seem to work as well, but at least the space between the tracks would be reduced, and I anticipate that I would be able to add more classification tracks. I hate to rip out anything that's already "permanently" installed, but it may be worth it in this case. ...Roy

  • @robertrodriguez6182
    @robertrodriguez6182 Před 9 měsíci

    Hi Roy! Such a long time I haven't seen new video regarding your layout!
    Wishing You're alright!
    RR.-

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před 9 měsíci

      Hi Robert! It really has been a long time. I've just been lazy. But there's good news: I'm going to publish a video on Saturday, Sep 30, called "New Scenery at Echo Canyon." I hope you get to see it. ...Roy

  • @64ElMariachi
    @64ElMariachi Před 5 měsíci +1

    hello! I don't do model railroads but do play Cities Skylines, and I've come to realize how much in common they both have. Could I send you an image of how I'm designing my rail infrastructure for a critique? I want to make it as real as possible, and still make it all functional.
    I'd love to hear more!

  • @petesilcox4102
    @petesilcox4102 Před rokem

    save the existing yard ladder, on each yard ladder turnout beyond the frog ,on the short curve to the yard track ,install. New turnout either a #6 or #4 turnout to connect to a new track between the existing tracks .

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      That's a great suggestion, Pete. I will be checking it out. If I can make it happen, you'll see it in a future video. ...Roy

  • @nickvivirito2214
    @nickvivirito2214 Před rokem

    I’m really enjoying your video Roy! Don’t be offended, but I have to ask you a question. I’m 61 years old, and I have N scale trains since I was about 8 years old. I have a nice layout, but over the past couple of years, have been having a challenging time with the size of N scale. My eyes, and fingers don,t work like they used to. Do you find you have this problem at all? It’s making me think that I should sell off all my trains, and moving up to HO or O and starting over 😞

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +2

      I hear you, Nick. For most of us, it does get harder to model in N scale as we get older, perhaps especially because of eye-sight and shaky hands. To be sure, each scale has advantages and disadvantages. But at 76, I'm continuing to stick with N scale, which I really like and which allows me to pack a lot more railroad in my limited space than HO or larger scales would. ...Roy

  • @mikerooney7928
    @mikerooney7928 Před rokem

    Not sure Roy, but maybe you could squeeze those yard tracks closer?

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem

      I think I could, Mike, if I replaced the No. 6 turnouts now in the yard ladder with No. 4 turnouts. We'll see. ...Roy

  • @beeble2003
    @beeble2003 Před rokem

    I'm a bit confused when you say that you didn't have space for separate arrival and departure tracks. Look at the photo at 4:25, and you see that the gap between two trains is about the width of a train. But at 6:25, the gaps between your tracks appear to be about twice that. It looks like you have space for separate arrival and departure tracks and at least one more classification track, without having to crowd things.

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před rokem +1

      Thanks for your comment, my friend. Yes, there is an excess of space between my yard tracks. That's because of the geometry of the Kato No. 6 turnouts that I have used in my yard ladder. I am thinking about replacing the No. 6 turnouts with No. 4 turnouts, which would reduce the space between the tracks and allow me to add more tracks to the yard. ...Roy

    • @beeble2003
      @beeble2003 Před rokem +1

      @@n-scaleunionpacificevansto6569 Oh, I see. Sucks when track manufacturers force that kind of thing.

  • @hoosiersub47167
    @hoosiersub47167 Před 7 měsíci

    How come your tracks in yard are so far apart as it looks like you should be able to get another 2 tracks

    • @n-scaleunionpacificevansto6569
      @n-scaleunionpacificevansto6569  Před 7 měsíci +4

      The spacing of the yard tracks was caused my use of Unitrack No. 6 turnouts rather than No. 4 turnouts in the yard. It's caused by the geometry of No. 6 turnouts. ...Roy

  • @dirkmontgomery5983
    @dirkmontgomery5983 Před rokem

    R🎉oy you ok aint been on in awhile miss dispatch