Deye Hybrid Inverter Max 16pcs in Paralleling Operation

Sdílet
Vložit
  • čas přidán 27. 09. 2023
  • Deye Hybrid Inverter Max 16pcs in Paralleling Operation
  • Věda a technologie

Komentáře • 20

  • @paweljandobruk1791
    @paweljandobruk1791 Před 7 měsíci

    Happy new year 2024 and thank You for diagram

  • @uw5eaf
    @uw5eaf Před 5 měsíci +1

    Hello! I have 2x Deye 5k inverters (and I want them to work in parallel), a single-phase grid and one single-phase generator with start-input (NO relay) for solar inverters. And I have a couple of questions:
    1. How should I connect generator to inverters? Should I connect it to only one of them or to both (GEN-port)? How should I connect G-V out of each inverter (should I connect them in parallel) to start the generator?
    2. What is powered from generator when grid is de-energized? Only battery charger or backup load directly also? (I mean: how critical is frequency stability of generator and what about it's power?)
    3. Am I right that I should configure "rated power" of generator as 1/2 of actual generator's rated power on each of 2 inverters?
    Thank you!

  • @mhpprofi
    @mhpprofi Před 6 měsíci +1

    Würde mich freuen wenn es solche Anleitungen auch in Deutsch geben könnte 👍 🇦🇹🇦🇹🇦🇹

  • @obusobusson736
    @obusobusson736 Před 5 měsíci

    Why is all the three , three-phase hybrid inverters, connected in parallel marked as master in the video? Shouldn't it be master --> slave--> slave?

  • @jermainwhyte6894
    @jermainwhyte6894 Před 6 měsíci

    Do you have a 12kw split phase 120/220 volt USA version that they are selling on alibaba? I want to get that size for Jamaica. I want to make sure it’s 120/220 volt split phase and not 220/230 volt. Thank you. Also do you have an official site I can buy from?

  • @FMG-MicroGas
    @FMG-MicroGas Před měsícem

    Can I parallel 16KW and 10KW hybrid inverter?

  • @user-gv3nw3dg6g
    @user-gv3nw3dg6g Před 10 měsíci +1

    hello , can i connect only two single phase inverter in parallel for a three phase load? and if yes how to do that.

    • @houcineamaidi499
      @houcineamaidi499 Před 10 měsíci +1

      no u can't becouse the load need three phase not two phase for example (motor electrical )

    • @user-gv3nw3dg6g
      @user-gv3nw3dg6g Před 10 měsíci +1

      @@houcineamaidi499
      thank you so much for your help

    • @DeyeInverter_official
      @DeyeInverter_official  Před 9 měsíci

      Hi.No you can't, you must use three phase inverters

  • @Black74c
    @Black74c Před 10 měsíci

    Need help on connecting 2x 8kw Deye Inverter in parallel, after programming the inverter do I merge the Load output cables ? Example: Master Live cable to Slave Live cable...am overthinking

    • @makunan
      @makunan Před 10 měsíci

      Yes, the diagram are the same for home load/grid output wires (same connector) and backup load wires, you need merge in their specific busbar. One for homeload/grid Line, other for neutral and other for Ground and the same configuration for backup load.

    • @DeyeInverter_official
      @DeyeInverter_official  Před 9 měsíci +1

      Hi,the load cables also need to be connected in parallel

  • @sanyapatm
    @sanyapatm Před 6 měsíci

    Can we do parallel 8kw deye hybrid with 5kw deye hybrid

  • @munkhnasan5589
    @munkhnasan5589 Před 5 měsíci

    Hello, How to connect the CAN wire to 5 inverters in parallel?

  • @Kiril_Bulgaria
    @Kiril_Bulgaria Před 10 měsíci

    Hello, could in the three phases parallel diagram CT to be replaced with smart meter?