Cutting length with bend deduction | Theoretical v/s Practical | Check on site

Sdílet
Vložit
  • čas přidán 5. 09. 2024
  • Hi friends,
    In this video I have checked the cutting length calculated on BBS and the cutting length taken on site and also the bend deduction which have to be considered while practically working with the reinforcement bars.
    #CivilEngineering #BBS #BendDeduction

Komentáře • 30

  • @gourabmukherjee2771
    @gourabmukherjee2771 Před rokem +2

    in IS code the value of A was from inside the stirrups which you took from outside.

  • @shrikantware7578
    @shrikantware7578 Před 3 lety +2

    Very useful video sir..plz make video on BBS for all members..👍👍

    • @EverythingCivil
      @EverythingCivil  Před 3 lety +1

      I have made on some..u can check..will try to make on all.

    • @shrikantware7578
      @shrikantware7578 Před 3 lety

      @@EverythingCivil Sir plz make sure value of A and B from IS code.A and B values are inside values.You have to substract bar dia from A and B

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 Před 3 lety

    Sir plz make a video
    1. Showing the drawing of pile, it's depth from the OGL
    2. How to give levels using level machine for the depth of pile core cutting
    3.Then how to give the level for the top level of pile cap using Auto level.
    Sir plz explain the things in pen and paper.
    Thnx for all ur efforts for us

  • @karmveersingh6616
    @karmveersingh6616 Před 2 lety

    Best video

  • @PrashantBasotra0143...
    @PrashantBasotra0143... Před rokem +1

    Sir ji meri ek Question hai.. Hum 12d hi kyu use karta hai.. aap muja explain kar do 12 kaha sa aaya.. bas aur kuch nhi

    • @gokulsivakumar4930
      @gokulsivakumar4930 Před rokem

      Can you add timestamp.. Where did he use 12d?

    • @amirahmadkhan1686
      @amirahmadkhan1686 Před 8 měsíci

      20 width 70 cm stirrup cut length if we provide 40mm concrete clear cover please on site

  • @ashutosharya6221
    @ashutosharya6221 Před 7 měsíci

    A and B should be considered as per centre line method

  • @naik5673
    @naik5673 Před 3 lety +1

    Sir
    Compressive strength ke liye site pe kitna cube bharna chahiye and
    Kitna cube aapke site pe bharte hai slab ke time pe?
    Uske upar bhi ek video banaiye.

  • @bipulsingha406
    @bipulsingha406 Před 2 měsíci

    Bend 5 nos hain sir, bend deduction=5*2d kar na chahiye tha

  • @Manjunath_pai
    @Manjunath_pai Před 3 lety

    If you take A and B distance from centre of stirrup then no need of bend deduction
    A= 650-40-40-8 = 562mm
    B = 230-40-40-8 = 142mm
    Cutting length = 1568 mm

    • @journeyviewers4600
      @journeyviewers4600 Před 2 lety

      8mm hai usska 4 half dia hoga na

    • @ashutosharya6221
      @ashutosharya6221 Před 7 měsíci

      You are right, you should consider 2(a+b) + 24 d if the hooks are bent at 135° and take 20d at the place of 24 d if the hooks are bent at 90°. No need to further consider the bend deduction.

  • @RAVIKUMAR-il1me
    @RAVIKUMAR-il1me Před 5 měsíci

    बहुत वीडियो देखी engg ki u tube par कुछ engg tie ka -4 -4 करते हैं c/c se कुछ नही करते कुछ bend loss krte है कुछ नही करते, kiya sahi hai kiya galat plz jankari do bhai interview mai kiya btay

  • @souravbhandari7348
    @souravbhandari7348 Před 3 lety

    sir, kindly make a video on full building bbs.. how to manage excel sheet floor wise.. it will be helpful..

  • @ameylokhande219
    @ameylokhande219 Před 3 lety

    Make videos material reconciliation steel cement

  • @ImranAli-tg2zi
    @ImranAli-tg2zi Před rokem

    90 digre 2d
    135digre 3d

  • @Unwire7
    @Unwire7 Před 9 měsíci

    Instead of -2d, make the formula simple. = 2[(L-2C)+(B-2C)]+16D

  • @RAVIKUMAR-il1me
    @RAVIKUMAR-il1me Před 5 měsíci

    -4-4 q nhi liya bhai

  • @sahani8214
    @sahani8214 Před 3 lety

    pls make more videos ,why u stopped uploading video ??

    • @EverythingCivil
      @EverythingCivil  Před 3 lety +1

      Wat topic u want?

    • @sahani8214
      @sahani8214 Před 3 lety

      @@EverythingCivil how to do footing layout according to centre line .

    • @sahani8214
      @sahani8214 Před 3 lety

      @@EverythingCivil and also how to do column starter on position on first slab , according to building phase. by centre line.

  • @Paidaisi_Engineer
    @Paidaisi_Engineer Před 3 lety

    Extra to hona hi tha bar because - 5 x 2d hota and u did only -2d

    • @EverythingCivil
      @EverythingCivil  Před 3 lety

      Sir is video me sirf ye batana tha ke koi bhi angle pe bend karo 2d hi deduction karna hai. Hamesha confusion hota hai ke alag degree ke bends ke liye alag deduction karna hota hai.