Everything Civil
Everything Civil
  • 158
  • 3 680 608
TYPES OF WATERPROOFING SYSTEM | Selection criteria | Which is cheapest?
Hello friends,
This is part 2 of the waterproofing expert series in this video I have explained about the types of waterproofing systems that are commonly used. By watching this video you will be able to understand the technical details that are required before doing the selection of suitable waterproofing system.
zhlédnutí: 716

Video

Basics and needs of waterproofing | waterproofing expert series
zhlédnutí 512Před rokem
Hello everyone. This a part of the entire series of waterproofing systems. Through this series you will be able to learn in depth about the types of waterproofing that is used in various location and selection of materials for protection to different types of structures. Please watch all the videos. Liked the video? Join our WhatsApp group of fresh and experienced engineers chat.whatsapp.com/Gl...
[English] Shuttering Design Process | Conventional shuttering | Construction and Execution
zhlédnutí 4,2KPřed 2 lety
Hello Friends, This video is for the shuttering design of a conventional shuttering systems. In-depth details and concept of shuttering design is discussed step by step in this video. It is really helpful in making decisions at site. Please watch this video for understanding the shuttering system in details : czcams.com/video/YSZWYMea4f8/video.html (in Hindi) Do comment below if you have any do...
BBS Tutorial on Continuous slabs | BBS on excel sheet
zhlédnutí 13KPřed 2 lety
BBS Tutorial on Continuous slabs | BBS on excel sheet
Silly mistakes to avoid in column steel | Zarur dekhiye
zhlédnutí 1,7KPřed 2 lety
Silly mistakes to avoid in column steel | Zarur dekhiye
What is BOQ? | Uses, preparing BOQ, needs | How to practically use BOQ?
zhlédnutí 1,4KPřed 2 lety
What is BOQ? | Uses, preparing BOQ, needs | How to practically use BOQ?
Design Philosophy of RCC Members | Must watch civil engineers | Useful for interviews and site
zhlédnutí 779Před 2 lety
Design Philosophy of RCC Members | Must watch civil engineers | Useful for interviews and site
Identification of continuous slabs from drawing | continuous slab ko kaise pehchane
zhlédnutí 8KPřed 2 lety
Identification of continuous slabs from drawing | continuous slab ko kaise pehchane
How to repair slab cracks? | slab me cracking ko kaise band kare
zhlédnutí 3,9KPřed 3 lety
How to repair slab cracks? | slab me cracking ko kaise band kare
Double Height Area Shuttering l Information aur kya chiz ka dhyan de check karte time
zhlédnutí 2,9KPřed 3 lety
Double Height Area Shuttering l Information aur kya chiz ka dhyan de check karte time
Joining old and new concrete | Old concrete ko new concrete se join kaise kare
zhlédnutí 78KPřed 3 lety
Joining old and new concrete | Old concrete ko new concrete se join kaise kare
Cutting length with bend deduction | Theoretical v/s Practical | Check on site
zhlédnutí 8KPřed 3 lety
Cutting length with bend deduction | Theoretical v/s Practical | Check on site
Dynamic Pile Test | Full procedure explained on site | Civil Engineers
zhlédnutí 9KPřed 3 lety
Dynamic Pile Test | Full procedure explained on site | Civil Engineers
Indian style to apply paint. 😂
zhlédnutí 790Před 3 lety
Indian style to apply paint. 😂
Construction of Pile Cap | Sequence of activities | Site Video
zhlédnutí 6KPřed 3 lety
Construction of Pile Cap | Sequence of activities | Site Video
SELECTION OF CONCRETE PUMP | For High Rise, Commercial, Low Rises Projects | *Solved Problem*
zhlédnutí 17KPřed 3 lety
SELECTION OF CONCRETE PUMP | For High Rise, Commercial, Low Rises Projects | *Solved Problem*
CONCRETE CUBE FAILED AT 28 DAYS | Next Step? | Decision of Site Engineer
zhlédnutí 5KPřed 3 lety
CONCRETE CUBE FAILED AT 28 DAYS | Next Step? | Decision of Site Engineer
NOMINAL MIX CONCRETE | HOW TO PREPARE ON SITE?
zhlédnutí 1,8KPřed 3 lety
NOMINAL MIX CONCRETE | HOW TO PREPARE ON SITE?
Advance Column BBS in Excel for Large Projects | For freshers | *Download Link*
zhlédnutí 48KPřed 3 lety
Advance Column BBS in Excel for Large Projects | For freshers | *Download Link*
Outer column starter shifted from building face | How to rectify?
zhlédnutí 12KPřed 3 lety
Outer column starter shifted from building face | How to rectify?
FLAT SLABS | Drawing Study | Steel Detailing | Drop Panel | Execution and Checking Complete video
zhlédnutí 30KPřed 3 lety
FLAT SLABS | Drawing Study | Steel Detailing | Drop Panel | Execution and Checking Complete video
Column Termination | Steel Detailing and Cutting Length
zhlédnutí 7KPřed 3 lety
Column Termination | Steel Detailing and Cutting Length
Rate Analysis of PCC work in 2020 | Practical Approach
zhlédnutí 13KPřed 3 lety
Rate Analysis of PCC work in 2020 | Practical Approach
What is fold slab ? | Steel detailing on site
zhlédnutí 7KPřed 3 lety
What is fold slab ? | Steel detailing on site
Quality check of Reinforcement Steel before unloading | MTC, Third party test
zhlédnutí 2,5KPřed 3 lety
Quality check of Reinforcement Steel before unloading | MTC, Third party test
Detailing of stirrups and cover in RCC beams | Site Visit
zhlédnutí 4,8KPřed 3 lety
Detailing of stirrups and cover in RCC beams | Site Visit
Provision for different grade of concrete in slab | Hy Rib Sheet | Construction Joint
zhlédnutí 3,2KPřed 3 lety
Provision for different grade of concrete in slab | Hy Rib Sheet | Construction Joint
Calculation of Built Up Area of Building | Payment stages to contractor for Civil Works
zhlédnutí 20KPřed 3 lety
Calculation of Built Up Area of Building | Payment stages to contractor for Civil Works
Labour Contract Rate in 2020 India | Calculation of Built Up Area Rate for Civil Works | HINDI
zhlédnutí 3,9KPřed 3 lety
Labour Contract Rate in 2020 India | Calculation of Built Up Area Rate for Civil Works | HINDI
Concrete Mix Design as per IS 10262 | For site engineers and supervisors 2020 | Quick Report
zhlédnutí 1,4KPřed 3 lety
Concrete Mix Design as per IS 10262 | For site engineers and supervisors 2020 | Quick Report

Komentáře

  • @kibuchomartin5016
    @kibuchomartin5016 Před 3 dny

    Hello Christian, I have a number of concerns. 1. HA UDL and HA KEL should be multiplied by lane factors in table 14. 2. The above-named HA loads should be divided by lane widths to get a UDL load. 3. HA KEL should be applied toa position with worst case effect for moments, mid span and shear, near supports.

  • @takeiteasesolutionchannel6956

    Tq bro nice explanation

  • @nileshvidhate4338
    @nileshvidhate4338 Před 5 dny

    Superb

  • @mr.patteerarummanee8862

    Can't do multiple sizes

  • @naushadalam7201
    @naushadalam7201 Před 15 dny

    Rcc drawings of a project expain in detail

  • @DEEPAK_From_UP
    @DEEPAK_From_UP Před 18 dny

    Thanks for live site knowledge.❤🙏

  • @srassetvisuals6108
    @srassetvisuals6108 Před 20 dny

    good job broo...

  • @91rohannipanikar71
    @91rohannipanikar71 Před 25 dny

    Sir in ts if u took a=55 and b=50 then why did u consider a=50 and b=55 in new size of base plate ??

  • @MirzaBaig-g9h
    @MirzaBaig-g9h Před měsícem

    You did not say anything about the rusted steel as noticed in the video

  • @kumarshantveerayya5114
    @kumarshantveerayya5114 Před měsícem

    Good information. Thank you. Could you make a video on if the same thing happen @ footing level

  • @INDIAN1947BHARAT
    @INDIAN1947BHARAT Před měsícem

    Very Nicely Explained 👍

  • @jparmar071
    @jparmar071 Před měsícem

    How to decide rate of steel nd shuttering agency's,?

  • @experience.ofconstruction

    good job bro ❤.

  • @ketangaikwad6520
    @ketangaikwad6520 Před měsícem

    Bracket kitne distance lagane hoge

  • @prakashranafamily3360
    @prakashranafamily3360 Před měsícem

    Extra bar ka to kuch bataya nehin

  • @Hastarplayz009
    @Hastarplayz009 Před měsícem

    Ek quastion ha bro Wall k side kyu shuttering kya ha

  • @ankursinghsingh729
    @ankursinghsingh729 Před měsícem

    Bhai aapne Ldt ka calculation galat kiya hai 51x16= 816mm aayega na ki 306

  • @yarkapwelly7034
    @yarkapwelly7034 Před 2 měsíci

    How do you place development length in the slab?

  • @snehasispatra8443
    @snehasispatra8443 Před 2 měsíci

    51x16 = 306 mm ???😂

  • @afzaltaisee779
    @afzaltaisee779 Před 2 měsíci

    very good

  • @bipulsingha406
    @bipulsingha406 Před 2 měsíci

    Bend 5 nos hain sir, bend deduction=5*2d kar na chahiye tha

  • @rohanjadhav9448
    @rohanjadhav9448 Před 2 měsíci

    Sir आपने बहुत अच्छी और सीधी भाषा मे समझाया..❤ एक एक टॉफिक अच्छी तरहसे समझ आया... खुप खुप आभारी आहोत sir आम्ही तुमचे..🤗💝

  • @rohanjadhav9448
    @rohanjadhav9448 Před 2 měsíci

    Thank you sir ❤

  • @EaglesFabricator
    @EaglesFabricator Před 2 měsíci

    Hello everyone we are manufacturer of hyrib mesh for more details check out my page or comtact us pan india delivery available.

  • @rohanjadhav9448
    @rohanjadhav9448 Před 2 měsíci

    Txn sir

  • @user-hk3og5nz1y
    @user-hk3og5nz1y Před 2 měsíci

    Sir, how to how to calculate for box section top plate bottom plate, Web plate, both side

  • @prakashmadne
    @prakashmadne Před 2 měsíci

    Sir, Can you explain, how to calculate sq ft rate to Built up Rate ?

  • @kiranundekar
    @kiranundekar Před 2 měsíci

    Then top cover will be Less from secondary beam top bar.is it ok?

  • @JMZPCom
    @JMZPCom Před 2 měsíci

    Brakect par net lagega

  • @deoraobankar8259
    @deoraobankar8259 Před 3 měsíci

    Thanks i understand.

  • @Nigurodipati
    @Nigurodipati Před 3 měsíci

    Perfectly explain thanks

  • @pranaychipkar6757
    @pranaychipkar6757 Před 3 měsíci

    What you do for cement slurry which go away from concrete near high ribs

  • @Oppositeworld163
    @Oppositeworld163 Před 3 měsíci

    How to calculate horizontal net quantity

  • @khemkarki7193
    @khemkarki7193 Před 3 měsíci

    thanks a lot , you have explained very clearly . i got it very clear . also I subscribed your channel goy future informative videos. thanks

  • @roshanabbas8781
    @roshanabbas8781 Před 3 měsíci

    Sir covered area/ builup area billing kaise kerte h uske uppar video banaye

  • @mona2323100
    @mona2323100 Před 3 měsíci

    Nice

  • @joramtajam4127
    @joramtajam4127 Před 4 měsíci

    What about base slab design???

  • @ashiqhindustani3472
    @ashiqhindustani3472 Před 4 měsíci

    Kya extra top ki जरूरत नहीं

  • @faizahmad3423
    @faizahmad3423 Před 4 měsíci

    Concrete retarding time mostly 3 hours hota h na sir ? You are saying 4 hours.??

  • @Deepakthakran88
    @Deepakthakran88 Před 4 měsíci

    Sir which brand is best for aac block

  • @abuUmamah2134
    @abuUmamah2134 Před 4 měsíci

    Video kay 2 minutes 55 seconds par aapnay kaha ki 10 MM P.P bordet rope Sawaala yeh hai ki - P.P ka full form kya hota hai Sir Please bataana 🙏

  • @DilshadKhan-601
    @DilshadKhan-601 Před 4 měsíci

    Very helpful and important video Retaining wall me two face hote hai inner and outer face Outer and inner bar uske reinforcement ko kaise terminate karte hai Please reply when you have time Thank you so much

  • @HSE.Knowledge
    @HSE.Knowledge Před 4 měsíci

    Koshish acha Kiya hai but us safety net main aadmi girega toh bahar ki taraf hi jayaega, inclined to position me (40-45°) rakhna compulsory hai, aur outer edge mein safety net sag jyada hai, allowable sag 5-10% of shortest side hona chahiye

  • @ManishNewa
    @ManishNewa Před 4 měsíci

    What is the life time of the bonding agent?

  • @Shoebali7
    @Shoebali7 Před 4 měsíci

    Nice information sirji thank you very much. 😇 Mera ek question tha sir. Agar hame on site client ko steel ki quantity bolna hai in terms of bundle, like 8mm ke 2 bundle, 10 mm ke 4 bundle aise. To wo hum kaisa calculate karte hai. Please guide sir.

  • @kaushikc235
    @kaushikc235 Před 4 měsíci

    IS PCC shuttering quantity is payable or not as per IS code ?

  • @kesavanraju8938
    @kesavanraju8938 Před 4 měsíci

    MISTAKE 1: YOU SHOULDNT CURTAIL MORE THAN 50 % BAR AT THE EXACT LOCATION, MISTAKE 2: OVERLAPPING SHOULDNT AT CORNER AT TOP AND MIDDLE AT BOTTOM.... FIGURED IN 15 SECONDS OF YOUR VIDEO... U R NOT A GOOD ENGINEER

  • @vijaynangarepatil8638
    @vijaynangarepatil8638 Před 4 měsíci

    Informative

  • @khan19faiyyaz
    @khan19faiyyaz Před 4 měsíci

    My duobt is if there is one way slab next to two way slab and the longer direction of both the slab is in same direction so longer side of two slab is considered as continuous or not?? Main point is we don't provide bentup bar in one way longer direction so will I continue the bar of longer direction of two slab into the one way slab as case define above if yes we need to provide distribution for bentup bar which was continuoued into the slab??