Are YOU Using this Primavera P6 Float Paths Feature?

Sdílet
Vložit
  • čas přidán 5. 09. 2024
  • Are you using the Float Paths feature in Primavera P6? We'll show you how to use this tool inside P6 to analyze your float as well as what you can do with the data outside of Primavera.
    Want to learn Primavera P6?
    www.planacadem...
    Looking to become a higher level P6 scheduler?
    www.planacadem...
    TAGS:
    primavera p6 tutorial, primavera p6 training, primavera p6 online training, p6 float paths, oracle primavera p6, project management, total float, plan academy, michael lepage, free float, scheduling, critical path analysis, critical path calculation, near critical activities

Komentáře • 39

  • @scottymac734
    @scottymac734 Před 7 měsíci

    Awesome explanation and guide. Plan Academy is consistently the best source of well-presented advanced P6 scheduling best practices instructions.

    • @PlanAcademy
      @PlanAcademy  Před 6 měsíci

      Thanks! That's an awesome endorsement!

  • @danialshaikh7796
    @danialshaikh7796 Před 8 měsíci +1

    Thank you so much for such an organized and clear video!

  • @dominicboakye8226
    @dominicboakye8226 Před rokem +1

    Amazing information sir. Thank you so much. Guys make sure you watch the video on how to calculate float paths.

  • @saurabhvaranasi3429
    @saurabhvaranasi3429 Před rokem +2

    I really like your videos and the effort you put in to make such informative videos! To be honest, I have been using these features for a while now. But, there are some basic concepts which become clear after watching your videos…and then I go like “Oh, that’s why I have been doing it this way” :)

    • @PlanAcademy
      @PlanAcademy  Před rokem +1

      Thanks, Saurabh!
      That's really great to hear. We appreciate it!
      So glad you (and hopefully others) get a lot out of our videos.

  • @munawarjack91
    @munawarjack91 Před rokem +1

    Gud Day Michael Great information keep it Up Boss Br, MUNAWAR

  • @PaulEwog116
    @PaulEwog116 Před rokem +1

    Excellent video. Very helpful. Thank you.

  • @pietererwee1845
    @pietererwee1845 Před 2 měsíci

    Can you kindly share the link to the "next video" mentioned at the end which explains how to use this feature to calculate multiple critical paths to intermediate milestones on a project?

  • @foroughhosseini3826
    @foroughhosseini3826 Před 11 měsíci +1

    Thanks for sharing your knowledge!

    • @PlanAcademy
      @PlanAcademy  Před 11 měsíci

      You're very welcome, Forough. We try, haha.

  • @joshocean1856
    @joshocean1856 Před měsícem

    great info

  • @eduardomunoz2764
    @eduardomunoz2764 Před rokem +2

    Excellent explanation, thanks.

  • @zahir585
    @zahir585 Před rokem +1

    Great content as always ❤ big fan of your channel, keep up the excellent work 🙌🏻

  • @rogermatildo780
    @rogermatildo780 Před rokem +1

    very helpful. many thanks!

  • @King_of_noobsXXX
    @King_of_noobsXXX Před 11 měsíci

    Really like your vedio. It was really helpfull to the problem which I had

  • @mohamadkhatib8624
    @mohamadkhatib8624 Před rokem

    Hi sir I’m having great time with your videos would you explain level of effort much appreciated it

    • @PlanAcademy
      @PlanAcademy  Před rokem +1

      No video for Level of Effort right now, but I do have a great blog post here that explains it: www.planacademy.com/level-of-effort-faq/

  • @AzharAli-pt5kf
    @AzharAli-pt5kf Před 4 měsíci

    While these activities with negative float show critical when simply filter critical path and not run the float path feature in p6

  • @jeevankg
    @jeevankg Před 3 měsíci +1

    super

  • @khaledAhmed-eb4be
    @khaledAhmed-eb4be Před rokem +1

    Very useful video

  • @mezuk04
    @mezuk04 Před 4 měsíci

    I have followed these guide but for some reason it doesnt display any float paths for my particular programme.

  • @Ahmadhamaad
    @Ahmadhamaad Před rokem

    It's great video and good described the Float Paths

  • @AzharAli-pt5kf
    @AzharAli-pt5kf Před 4 měsíci

    @azhar ali
    Very informative. I have encountered one problem with float path. Activities with negative float are showing non critical when run schedule with float path and filtered the paths from 1 to 10. What could be the possible problem?

  • @rahouls2415
    @rahouls2415 Před 11 měsíci

    clear can understand😊

  • @ma1kp83
    @ma1kp83 Před rokem +1

    Really very nice ❤

  • @benzonjhermogeno
    @benzonjhermogeno Před 5 měsíci

    Done subscribing👍

  • @thebigmora
    @thebigmora Před rokem

    Great job

  • @MD-lk4qr
    @MD-lk4qr Před rokem

    thanks for this amazing video but how can i find the next video related to this video?? im lost

    • @PlanAcademy
      @PlanAcademy  Před rokem

      You're welcome - sorry this is an exerpt from my Advanced P6 Schedule Building course....the next video is only available in the course.

  • @MiscBurch
    @MiscBurch Před rokem

    Please drop the vest and hard hat moving forward, it is unnecessary and a little used car.

    • @PlanAcademy
      @PlanAcademy  Před rokem

      Cars do inherently lose value as soon as they become used. But they don't lose their usefulness.
      We had actually shot the first take with 2 hard hats, but we decided that was too much.

    • @galvanizedgnome
      @galvanizedgnome Před rokem

      Lol. This guy drinks hater aid