Rough, overgrown tracks on Mass Coastal Watuppa Branch - 6/2024

Sdílet
Vložit
  • čas přidán 25. 08. 2024
  • In this video we follow Mass Coastal train MC-4 down the Watuppa Branch in New Bedford and Dartmouth, MA. With the summer almost here the adjacent brush is now encroaching on the right of way and that is evident in this video. The line was acquired in December 2023 when MC purchased the Bay Colony Railroad . The track is rough from years of minimal maintenance by previous owners Penn Central, Conrail, and CSX who eventually handed off this part of the line to Bay Colony in the early 2000's. BCLR was able to fix up some of the track during their ownership but it was still far off from the level and straight track of the mainlines. MC has begun some trackwork on the line so stay tuned for future updates on their progress.
    New Bedford & North Dartmouth, MA
    6/2024
    Flickr:
    www.flickr.com...
    Comments? Questions?
    Just leave a note in the comment section and I'll get back to you.
    ©2024 South Coast Rail Videos

Komentáře • 68

  • @1361057
    @1361057 Před 2 měsíci +15

    Yep, definitely rough! Good job, once again capturing branch line service.

  • @armandoperez7967
    @armandoperez7967 Před 2 měsíci +4

    You really could get seasick on this line! At least it is active and not abandoned.

  • @lynwoodreed9032
    @lynwoodreed9032 Před 2 měsíci +18

    anybody seasick on this trip?

  • @stevebayorgeon9905
    @stevebayorgeon9905 Před 2 měsíci +4

    Great video! I really enjoy the way you cover branchlines in your area. Really like some of the telephoto shots especially the night one. I also appreciate the graphics with location info. Keep up the good work.

  • @heathcliff8624
    @heathcliff8624 Před 2 měsíci +6

    Some great footage.

  • @scottfrezza3573
    @scottfrezza3573 Před 2 měsíci +4

    And to think Conrail years ago ran on that track delivering beer to colonial beverage

  • @plymouthrock7282
    @plymouthrock7282 Před 2 měsíci +5

    Another great catch of Mass Coastal

  • @BSPIVEY100
    @BSPIVEY100 Před 2 měsíci +3

    Just like watching the videos of the ND&W.

  • @GreatWhiteZep
    @GreatWhiteZep Před 2 měsíci +5

    This used to be such a vibrant line at one point in time, now it's just fallen into disrepair

  • @erikmcc804
    @erikmcc804 Před 2 měsíci +4

    An awesome catch, thanks. Is this Penn Central 2.0? Lol

  • @rrad8106
    @rrad8106 Před 2 měsíci +4

    Wow! I got 50-year-old Lionel train track in better condition than that!
    I was wondering how DBS got their shipments! Nice to see active sidings! Wish they would rebuild the one out to Gold Medal Bakery on Bay Road.

  • @michaelfoster1453
    @michaelfoster1453 Před 2 měsíci +2

    Wing and a Prayer Railroad. If we can't get to ya, nobody else will either. : )

  • @ericposey1986
    @ericposey1986 Před 2 měsíci +2

    Maybe the new owners will fix the deferred maintenance line and get it up to track speed.

  • @cliffchance347
    @cliffchance347 Před 2 měsíci +5

    Looks like 5MPH track to me 🫰🏼

    • @williamh.jarvis6795
      @williamh.jarvis6795 Před 2 měsíci +2

      Surely, the track appears not much different from that of the Napoleon, Defiance and Western Railroad, in its beginnings of operations. Watch one of the earlier videos of them. (Yeah! I understand that telephotography of railroad tracks will highlight horrendous any track conditions.)
      Supposedly, that track is former Maumee Route trackage and was built across swampland. The ND&W is making headway as to getting their tracks upgraded, little by little, but, with some effort and incentive to thrive.

  • @My.Trackside.Edventures
    @My.Trackside.Edventures Před 2 měsíci +1

    Rock & roll railroading!

  • @hemihead68
    @hemihead68 Před 2 měsíci +1

    great work on all video editing / camera and audio

  • @dkneuer
    @dkneuer Před 2 měsíci +5

    Very expensive equipment going over this track is nuts.need to replace some ties too get more track stability. Looks like if they went faster,they would tip over from the rocking.

    • @alwhalen3488
      @alwhalen3488 Před 2 měsíci +1

      It's really not as bad as it looks. The BCLR track supervisor there considered it 'ugly track, not bad track'. It does meet FRA Excepted track standards which in reality means that as long as it holds the guage it's ok to use at 10 MPH.

  • @Mike-rx4in
    @Mike-rx4in Před měsícem

    That is definitely a Hooterville!

  • @seamusoreilly804
    @seamusoreilly804 Před 2 měsíci +3

    Wanna’ see rough? Watch some of the videos of Indian trains. It’s a miracle they can stay on the tracks.

    • @25mfd
      @25mfd Před 2 měsíci +2

      EXACTLY... and for what it's worth, the track seen here certainly could use work but it's not that bad... like you said, there IS worse out there... WAY worse

  • @cliffchance347
    @cliffchance347 Před 2 měsíci +5

    Bet that siding switch is frozen shut

  • @davidklauer3422
    @davidklauer3422 Před 2 měsíci +6

    Miss the old south coast
    Wonder what they’re doing with the locomotives

    • @1361057
      @1361057 Před 2 měsíci +2

      Huh??? Are they out of business?

  • @normrosen9404
    @normrosen9404 Před 2 měsíci

    The Bells have a catchy beat

  • @thepozfromoz5166
    @thepozfromoz5166 Před 2 měsíci +2

    I believe some track replacement is needed on this stretch of line! If I was the conductor or engineer,I think probably would have to puke at some point! If the old Reed rd. crossing has signals,time to get them working!

    • @alwhalen3488
      @alwhalen3488 Před 2 měsíci +1

      ALL of the crossing signals were working when Bay Colony left. No idea why MC has issues with them.

    • @thepozfromoz5166
      @thepozfromoz5166 Před 2 měsíci

      @@alwhalen3488 yea that's weird! Always liked watching bay colony but atleast they're still running the line. Looking for more landish industrial park videos....I enjoy them too! 👍👍👍👍

  • @RobertPaniagua
    @RobertPaniagua Před 2 měsíci +2

    Maybe they should fix the tracks and have this used for passenger service to North Dartmouth or even further west

  • @happyhome41
    @happyhome41 Před 2 měsíci +4

    I’m curious, do “they” send down a gage car ahead of time, to reduce the probability the engine will derail ?

  • @NormanJaquemotRebel
    @NormanJaquemotRebel Před 2 měsíci +4

    It looked like a Maumee and western video. You guys want to become Mass Coastal and western?

  • @lloydsheck1268
    @lloydsheck1268 Před 2 měsíci +1

    Time for new Rail

  • @crlaw75
    @crlaw75 Před 2 měsíci

    Neat night shots.

  • @joshbenton4080
    @joshbenton4080 Před 2 měsíci +2

    Wow, I'd say MC NEEDS to do a track rehabilitation project on those tracks! (Those freight engines and cars displayed the "rocking" that most train videos from the 1970's had shown) These tracks look almost as bad as the Milwaukee Road's tracks, just before they went bankrupt in 1977. Do these tracks on the Watuppa Branch still have the New Haven's 107 Pound rail? I know the crossings have heavier rail, as there's "compromise bars" joining the lighter rail to the heavier rails.

    • @alwhalen3488
      @alwhalen3488 Před 2 měsíci +3

      New Haven 100 lb rail on most of the line. Some 107 in spots. Crossings have 132 or 136.

    • @joshbenton4080
      @joshbenton4080 Před 2 měsíci +1

      @@alwhalen3488 Thanks Al, I thought the crossings had probably 115 Pound rail. (I didn't know there's "compromise bars" for 100 - 132 rail or 107 - 132) In my neck of the woods, the rail line has mainly 115 rail, with the oldest sections still with the B&O's 100 pound rail from the 1930's or early '40s. The most recently installed tracks are with 132 "Ribbon Rail".

  • @pstr_93
    @pstr_93 Před 2 měsíci +2

    Hey sweet video! are there certain days this job runs? or an as-needed basis?

  • @BG-sl9lv
    @BG-sl9lv Před 2 měsíci +5

    Weebles Express

  • @NormanJaquemotRebel
    @NormanJaquemotRebel Před 2 měsíci +2

    Not fixed yet? Gee, I thought Spencer Gwendolin was gone...

  • @svenmartin840
    @svenmartin840 Před 2 měsíci

    I hope one day they get the funds from the federal government to improve the the trackage and the railbed

  • @bethanybarrow4380
    @bethanybarrow4380 Před 2 měsíci +3

    Will Shawmut Ave ever get gates?

    • @alwhalen3488
      @alwhalen3488 Před 2 měsíci

      It just got upgraded to LED lights, a new cantilever and a second bell about a week before MC took over. Not a busy enough street or rail line to warrant gates.

  • @haroldreardon1407
    @haroldreardon1407 Před měsícem

    Its simple. When you are delivering 10- 20 cars a week ( guessing ) your railroad can NOT be a 70 mph high speed carrier. You can still work at 10 mph.

  • @peterharvey1762
    @peterharvey1762 Před 2 měsíci +1

    Is this America or rural Asia ? Those lines are way out of gauge

  • @waynelkohrjr.8557
    @waynelkohrjr.8557 Před 2 měsíci +1

    What keeps that engine on the track's.

  • @bigbilly7865
    @bigbilly7865 Před 2 měsíci +3

    🚂🚂🚂🚂🚂🚂🚂🚂🚂🚂

  • @fhowland
    @fhowland Před 2 měsíci +2

    Why two locos?

  • @islandnightowl
    @islandnightowl Před 2 měsíci +1

    Newbie question. Why are the rail/tracks so bowed and twisted please?

  • @hemihead68
    @hemihead68 Před 2 měsíci +1

    bouncy bouncy

  • @cmphighpower
    @cmphighpower Před 2 měsíci +1

    50 years of deferred maintenance

  • @ulrichfrank4270
    @ulrichfrank4270 Před 2 měsíci +1

    Cannot understand how something like this can get a license to operate.

  • @MiguelNavarreteCruz
    @MiguelNavarreteCruz Před 2 měsíci +1

    Que bonitos árboles donde pueden comer frutas los maquinistas

  • @ryansaylor6043
    @ryansaylor6043 Před 2 měsíci +3

    How do those tracks get to be in such a state of disrepair? Whose job is it to maintain them. Can't believe this is the 21st century and we have railroads looking like they were laid in the civil war era.

    • @dannyhonn973
      @dannyhonn973 Před 2 měsíci +2

      Depends. Railroad if owned by them. If leasing from state, they might have to pay for it. Could be railroad would have to get FRA loans to upgrade track, pay it back

  • @waynelkohrjr.8557
    @waynelkohrjr.8557 Před 2 měsíci +1

    Why don't they fix their railroads I think the ties need replaced.

  • @petercole8798
    @petercole8798 Před 2 měsíci

    When is the new Fall River New Bedford Line Starting Up. Is This Rail Line Part Of It.

    • @WesternNewYorkRailfan420
      @WesternNewYorkRailfan420 Před 2 měsíci +1

      No, this portion is freight only, believe it’s set to begin operation next year

  • @etevejames4264
    @etevejames4264 Před 2 měsíci +2

    its 2024 . why dont they fix the track. its dangerous even at 5 miles per hour

  • @wrjidema
    @wrjidema Před 2 měsíci

    How many customers at the Watuppa branch?

  • @patricknoveski6409
    @patricknoveski6409 Před 2 měsíci +1

    Isnt that against the law.? Any law?😅

  • @paulrogers4443
    @paulrogers4443 Před 2 měsíci +1

    Playing pretty fast and loose on such badly maintained track! Accident looking to happen!

  • @RaulGonzalez-jg8ks
    @RaulGonzalez-jg8ks Před 2 měsíci

    Dan pena ajena con esas vías.

  • @billyhowell1677
    @billyhowell1677 Před 2 měsíci +4

    Man that's sketchy as hell.

  • @wowcoolrex1040
    @wowcoolrex1040 Před 2 měsíci +1

    the railway looks like s**t