MONTREAL METRO MR-73 train at McGill metro station

Sdílet
Vložit
  • čas přidán 25. 03. 2023
  • MR-73 train passing through McGill metro station heading towards Angrignon. The green line is not yet entirely runned by Azurs. There are only 71 Azur train sets and they've temporarily stopped building new ones. These existing sets are enough to run 100% on the orange line and 90% on the green line.
    Video filmed the 24th of march 2023 à 12:44 PM.

Komentáře • 8

  • @rick14891
    @rick14891 Před 11 měsíci +1

    On crérrait entendre le Jeumont tellement il sonne fort :O

  • @SkyOfTheUniverse
    @SkyOfTheUniverse Před rokem +2

    Merci

  • @geoffreycezaretti5704
    @geoffreycezaretti5704 Před rokem +4

    This is the most beautiful chopper in the world, it looks like he's singing. Someone please make an inductor recorded of them before they are replaced.

    • @gladyshev_v
      @gladyshev_v Před rokem +1

      90Hz → 120Hz→180Hz-240Hz-360Hz ("Dou-dou-dou" named part). Try play this in DC frequency (tone) generator with sawtooth waveform

  • @kaiserof6treet
    @kaiserof6treet Před rokem +4

    J espère qu il restera encore des MR-73 sur la ligne verte marre de voir ces azur partout 😅...

    • @TrainsSpectaculairesMontreal
      @TrainsSpectaculairesMontreal  Před rokem +1

      Il va en rester jusqu’en 2036. Éventuellement, ces trains MR-73 vont éventuellement être retirés du réseau et remplacés par les trains AZUR.

  • @lucasgelevatorsandmore7722
    @lucasgelevatorsandmore7722 Před 3 měsíci

    So they are still building azur sets

  • @alexanderblack827
    @alexanderblack827 Před rokem +1

    Je suis content que la police de Montréal réprime la mendicité parce que les gens ne s'attendent pas à être harcelés par des inconnus pour de l'argent.