LINKING FULL PROJECT FILE AS 'EXISTING' CONSTRUCTION: For demo and renovation work

Sdílet
Vložit
  • čas přidán 27. 08. 2024

Komentáře • 17

  • @jesshernz839
    @jesshernz839 Před 10 měsíci +1

    This is amazing! Thank you so much for this great tutorial. Excellent teaching I really appreciate the time you took in explaining what was going on;)

  • @b_gumm
    @b_gumm Před 9 měsíci +1

    Thank you for sharing Mike. I am surprised that you did not bind the old project. Not sure if this is a best project. Would thought it would be.

  • @mohammadmudassirrizwan7884

    Great teaching!!! I love it
    Please make a video on Point cloud how it works

    • @miketaylor8211
      @miketaylor8211  Před 2 lety +1

      Great suggestion! I don't actually HAVE a point cloud that I can use for a Revit Tip. So perhaps I'll look for one in the internet and then use it for a Tip! Thanks for the suggestion.

  • @valeriepierre7297
    @valeriepierre7297 Před 5 měsíci

    Amazing. Thank you!

  • @patricktryep224
    @patricktryep224 Před 10 měsíci +1

    thanks for your good tutorials. Can you please explain how to geolocate a project in revit

  • @okzzvil7617
    @okzzvil7617 Před rokem +1

    Man, This is cool.

  • @juliepiper7058
    @juliepiper7058 Před rokem

    sometimes we are all a bit coo coo (as I spell it) and honestly, if we could all be as happy and passionate as you, we'd be a much better world :-)

  • @jesuswilhelm4294
    @jesuswilhelm4294 Před rokem

    This video helped me a lot, Thanks Mike.

  • @binukumar7747
    @binukumar7747 Před 2 lety +2

    nice
    😊

  • @cristophersuazo
    @cristophersuazo Před 3 měsíci +1

    But what would happen if i had already crete two models, the existing model and de future model abowe the existing one, but i need to create the demolition and de new constructioon phases?
    Thanks for your answer...

  • @jmqrsq
    @jmqrsq Před rokem

    This is good stuff. I do wonder if there are any downstream process issues. Things like using Revit keynoting for demo plans in the new. I assume as long as both files are pointing to the same keynote file you will be able to keynote the demo items in the new project. I believe it doesn't work that way, however. I believe you would need to keynote them in the old original linked file first and then you can keynote them in the new project.

    • @miketaylor8211
      @miketaylor8211  Před rokem +1

      I make a keynote file with a D in front of items that are demo (D1, D2, D3) and normal numbers for the new work items (1, 2, 3). Revit can only use one keynote file at a time.

  • @WoodyRe
    @WoodyRe Před rokem

    Nice and great!

  • @ArqHectorjr
    @ArqHectorjr Před 2 měsíci

    Thank you for your amazing work. I do still have a situation though, Im pretty sure you can help me out. What if i did make the as-built (existing) drawing of the building, saved it as "As-Built" and then from that same drawing i saved it as "Renovation" so i can have both projects and do the work from the "As-Built". But now that im done with the renovation plans, i want to put both projects together for the presentations, show what had been demo, added and so on... CAN I DO SO, AND IF YES, HOW CAN YOU EXPLAIN PLEASE? Muchas Gracias!!!

  • @tsoufikyaya8262
    @tsoufikyaya8262 Před rokem

    Thank you for your sharing. My question is, are there other uses for phase mapping? For the example you did in the video, how your method is more interesting than making a copy of the old project and doing the job as we used, instead to use two files.

  • @wrighthausracing9641
    @wrighthausracing9641 Před 2 lety +1

    Nice work.... can we talk facia yet? 😊