How to Perform a Vertical Lower | CMC Pro Tip

Sdílet
Vložit
  • čas přidán 11. 09. 2024

Komentáře • 4

  • @aerialrescuesolutions3277

    Very well done. I love this , over and over and over. Jim.

  • @mr34
    @mr34 Před rokem

    You should look at the Petzl Nest, much simpler and has a spreader bar already built in for easy transfer from horizontal to vertical.

  • @George.William
    @George.William Před 8 měsíci

    Why did you wait until the patient was lowered over the edge and under load before clipping the spreader bar webbing into the carabiner (about the 5:45-5:55 mark)?

    • @cameronfaison2118
      @cameronfaison2118 Před 4 měsíci

      Because if you notice as they began the lower, if the webbing had been clipped in, it would have prevented the stokes from dropping flush against the wall as the first half of it went over. The idea is to have it slowly follow the ledge over until its vertical.