Detailing a floor transition with ICE Panels

Sdílet
Vložit
  • čas přidán 14. 09. 2020
  • In this video I explain how to properly detail a floor transition using the ICE panel building system by Greenstone Building Products.

Komentáře • 1

  • @DanLiese
    @DanLiese Před 4 měsíci

    why didn't you run the blue vapor guard all the way up the sides of the inside metal so in case water got under all this caulk (which can fail) it did not sit there or get under back metal track?