Mumbai Coastal Road Project Progress | Full Project Details

Sdílet
Vložit
  • čas přidán 21. 11. 2023
  • The Coastal Road (officially to be named as Chattrapati Sambhaji Maharaj Coastal Motorway) is an under construction 8-lane, 29.2-km long grade separated expressway that would run along Mumbai's western coastline connecting Marine Lines in the south to Kandivali in the north. It is projected to be used by 130,000 vehicles daily, and is expected to reduce travel time between South Mumbai and the Western Suburbs from 2 hours to only 40 minutes.
    Support Us - droneman@ibl
    Support Us by Joining Our Patreon : / droneman
    Connect me on -
    Twitter - / dronemanyt
    Instagram - / dronemanyt
    #mumbai
    #coastalroad
    #droneman
    Mumbai Coastal Road Project Update
    Mumbai Coastal Road Project Progress
    Mumbai Coastal Road Project Full Details

Komentáře • 833

  • @PowerTrain
    @PowerTrain Před 8 měsíci +46

    finally coastal road bhai !

  • @TGill22
    @TGill22 Před 8 měsíci +284

    This channel is a blessing for India, documenting India and the progress of our country in such a beautiful and understandable way. I see many government ads or presentations where they
    try to show the development but never get the feeling of simplicity and beautiful presentation like we often see in Western projects. This Channel does that work for the government.
    I hope all these videos survive for a long time and if someone wanted to include past projects these scenes are part of that, not ugly footage made by the government or immature
    CZcamsrs or unprofessional news channels

  • @bibhu1991
    @bibhu1991 Před 8 měsíci +106

    Finally someone covered it start to end unlike others who were just covering the Haji Ali interchage. Another splendid work Droneman bro

  • @Anonymous-pn1ih
    @Anonymous-pn1ih Před 8 měsíci +544

    Belive me guys you will be shock to see after it get ready completely.

    • @teachyourselfcomputerscien9178
      @teachyourselfcomputerscien9178 Před 8 měsíci +9

      Can you elaborate ?

    • @devangshah123
      @devangshah123 Před 8 měsíci

      @@teachyourselfcomputerscien9178 meaning, bahut hi aacha project hoga

    • @abhijitjoshi4773
      @abhijitjoshi4773 Před 8 měsíci +48

      Yes we will be shocked when we will drive our electric car in
      2035.

    • @aps_indian
      @aps_indian Před 8 měsíci +13

      Hope finishing is as good as shown in renders🤞🇮🇳

    • @pv8929
      @pv8929 Před 8 měsíci +36

      ..shocked to see it still doesn't solve the traffic issue 😂

  • @TheGeorgeous
    @TheGeorgeous Před 8 měsíci +232

    Should have included a metro line in the plan as well. Would be cost effective and future proof

    • @ojaspatil7862
      @ojaspatil7862 Před 8 měsíci +7

      they probably will add something similar in the future

    • @ani1690
      @ani1690 Před 8 měsíci +19

      There is already a metro aqua line planned which is under ground

    • @shivam_nagar69
      @shivam_nagar69 Před 8 měsíci +1

      It is there.

    • @hadhamalnam
      @hadhamalnam Před 8 měsíci +3

      Metro lines should be built within the city so that most of the city is within walking range of metro stations. Bypass roads like this are the opposite, they are separated from the city to divert traffic

    • @darshanawale3744
      @darshanawale3744 Před 8 měsíci +2

      There is a network of metros planned in Mumbai which will be executed in next 10 years.
      Currently Line 1 and Line 2A & Line 7 are active. Line 3 (first underground metro in India) will be operational by march. Line 3 (also called Aqua Line) will connect south mumbai to north mumbai

  • @mukeshvig174
    @mukeshvig174 Před 8 měsíci +22

    Beautiful.
    Like they say - Modi Hai tto Mumkin Hai 👍👍👍
    Thank you for the tour ~

    • @jedi77866
      @jedi77866 Před 8 měsíci +11

      bmc bna rhi hai😅 apne hi paiso se. Isme bi modi ko credit?

    • @mindguru22
      @mindguru22 Před 8 měsíci

      Should be BJP hai tho mumkin hai.

    • @youtubeee2306
      @youtubeee2306 Před 8 měsíci

      Hutiya h mudi
      Mudi hatao desh bachao

    • @bhavneshbhoir9005
      @bhavneshbhoir9005 Před 8 měsíci +3

      Abe Uddhav thakrey ne ye project announce Kiya tha Modi kaha se aaya aur ye bms ka project hai

    • @siddheshbirje6050
      @siddheshbirje6050 Před 8 měsíci +2

      ​@@mindguru22bjp opposed this project in early days bcz this is uddhav thackreys dream project

  • @tusharmahaley
    @tusharmahaley Před 8 měsíci +49

    This is the channel why we don’t have to worry about progress.
    A detailed review is always there with latest updates.
    Thanks @Droneman

  • @Atif-dr7bv
    @Atif-dr7bv Před 8 měsíci +137

    After the construction of this bridge, Mumbai's infrastructure will be counted among the best cities in the world.

    • @rohanjoshi6871
      @rohanjoshi6871 Před 8 měsíci +18

      ROFL 😂

    • @Maratha382
      @Maratha382 Před 8 měsíci +21

      Tokyo, Shanghai, Singapore, London, New York, Sydney, Amsterdam, Barcelona, Madrid and many more: am I a joke to you?

    • @soumyadeepchowdhury3585
      @soumyadeepchowdhury3585 Před 8 měsíci +5

      😂😂😂😂😂 kutch vi. First compete with delhi , Kolkata infrastructure

    • @rohanjoshi6871
      @rohanjoshi6871 Před 8 měsíci +14

      @@soumyadeepchowdhury3585 inke jaise log pehle to india se bahar kabhi gay le nahi rahenge waha ka infra deke nahi rahenge. Fir bolenge india ka hi sabse best hai "in the world" funny people

    • @harankumar7745
      @harankumar7745 Před 8 měsíci +6

      @atif 100 billion dollars should be spent in next 10-15 years to make Mumbai top 5 world city. It will come within top 10 world city after the completion of all onging projects.

  • @ajayvichare638
    @ajayvichare638 Před 8 měsíci +43

    Excellent information as usual
    This road is built by BMC ( tax payer s of Mumbai).
    Like other road projects in India we need not to pay Toll Tax.
    It is totlly toll tax free.

    • @ap2149
      @ap2149 Před 8 měsíci +5

      It is connected to worli Bandra sealink where toll is taken.. 😊

  • @sahilkumarrao98
    @sahilkumarrao98 Před 8 měsíci +50

    I don't usually comment on videos but this is beyond extraordinary! The video is not only informative but also a visual treat, showcasing exceptional video-making and visualization skills. Keep up the fantastic work!
    As a former Mumbai resident now living in the US for higher studies, I hope everything gets done by 2027 so that I can finally return and spend rest of my life in this transformed city.

    • @cannibalronny7314
      @cannibalronny7314 Před 8 měsíci

      To gaya kyu wahana pe lode Ke baaal,baap ke paise udaane,zaaatu saaala

    • @8876abhinav
      @8876abhinav Před 7 měsíci +3

      Similar sentiment. Plan to return by 2030. Hoping atleast 8-9 of the 14metro lines, atleast two terminals and both runaways of Navi Mumbai airport, Mumbai Ahmedabad bullet train, transharbor link, virar alibaug multimodal corridor, Versova Bandra and Versova dahisar sealink, Delhi Mumbai expressway, Mumbai pune expressway missing link, Mumbai nagpur expressway, sewri worli connector, coastal road - eastern freeway tunnel, goregaon mulund link road are implemented by then and advanced construction of remaining metro lines, Mumbai nagpur bullet train, development of third Mumbai near Navi Mumbai airport, dharavi redevelopment , kharghar IT Park, eastern waterfront development is underway. A lot of huge projects that could finally give Mumbai the uplift it needs

  • @Bhanu-vs3bj
    @Bhanu-vs3bj Před 7 měsíci +23

    India is becoming again a golden bird❤ we need stable government like BJP

  • @VIHANBLOG
    @VIHANBLOG Před 8 měsíci +2

    A good project by BMC N UDDHAVJI Thakre...

  • @ranjitkorange2608
    @ranjitkorange2608 Před 8 měsíci +3

    सबसे अच्छा वीडियो आजतक. ..जिसने properly explaine कीया मुंबई coastal region को ❤❤🙏🙏

  • @SantoshJadhav-uu9tn
    @SantoshJadhav-uu9tn Před 8 měsíci +3

    Finally mumbai coastal roads works completely done by Devendra fadvanis ji

  • @sahilshitole1061
    @sahilshitole1061 Před 8 měsíci +4

    Thanks You Deva Bhau For Transforming India

  • @devangshah123
    @devangshah123 Před 8 měsíci +7

    amazing waiting for it premier at 9am....its 8.57 am right now

  • @VALAR_Morgulis.
    @VALAR_Morgulis. Před 8 měsíci +27

    Speed of this project is god level... India never witnessed this type of speed in any construction speed...

    • @mrunknown4187
      @mrunknown4187 Před 8 měsíci +23

      Modi h to munkin h 😂

    • @rushitanpure
      @rushitanpure Před 8 měsíci +6

      ​@@mrunknown4187yeah but this is mumbai's project and mostly Maharashtra gov is handling this

    • @mrunknown4187
      @mrunknown4187 Před 8 měsíci +7

      @@rushitanpure exactly... Maharashtra me abhi nai eknath sindhe ki sarkar h.. Bjp supported... Ese or kai projects or uske liye land accusations jo thakre gov ke under atka huya tha usko pass kiya h sindhe gov n....
      Political stability is the key to progress.. Talk about gujrat or south... If there is political stability then both bjp and congress has done good job...

    • @siddheshbirje6050
      @siddheshbirje6050 Před 8 měsíci +5

      ​@@mrunknown4187ghanta modi.. this is uddhav thackreys dream project. And fully funded by bmc not by central govt.. in early stages bjp opposing this project bcz of uddhav thackreys dream project. Andh bhakt go and do some homework first

    • @siddheshbirje6050
      @siddheshbirje6050 Před 8 měsíci +3

      ​@@mrunknown4187good joke.. this is uddhav thackreys dream project. Everyone knows this. Fully funded by bmc which was in hand of shivsena. Get some basic information. And for your kind information. Bjp opposing this project in early days bcz of uddhav thackreys dream project

  • @samimukadam5343
    @samimukadam5343 Před 8 měsíci +9

    Very nice video!!! Also thank you for showing traffic flow:). It is critical drivers maintain lane discipline since interchanges are large and complex!

  • @gauresh3008
    @gauresh3008 Před 8 měsíci +30

    Phase 2 is much more challenging i.e from bandra to kandivali. Lot of ecological challenges will be faced. Phase 1 is the easiest compared to phase 2

  • @riteshdeshmukh7545
    @riteshdeshmukh7545 Před 8 měsíci +2

    Such Great Project Thanks Devedra Fadnavis Sir🙏

  • @RamKasare_BJP
    @RamKasare_BJP Před 8 měsíci +3

    Thankyou Devendra sir for developing Mumbai...

  • @vrvlogs2468
    @vrvlogs2468 Před 8 měsíci +10

    My god you did so much informative reasearch you are master brother, we appreciate your efforts.

  • @adityamahore2086
    @adityamahore2086 Před 8 měsíci +75

    The overall project is good but I think the 2000 vehicles capacity parking spaces is so less for city like Mumbai, it should be at least 10k capacity. Btw great video keep it up droneman.

    • @mukeshvig174
      @mukeshvig174 Před 8 měsíci +9

      I think he said there are a few such 2000 car garages.

    • @shreeveda
      @shreeveda Před 8 měsíci +15

      No amount of parking spaces are enough for Mumbai. 😂🤣😆

    • @user-ij5dw3ob5o
      @user-ij5dw3ob5o Před 8 měsíci +7

      Mumbai ko traffic free banane ke liye ek hi solution hai byaaya bhagao Mumbai bachao😂😂😂

    • @mukpat001
      @mukpat001 Před 8 měsíci +8

      @@user-ij5dw3ob5okuch bi fir labour kaam kon karega? local marathi people? Thoda sochke to bolo... UP bihar walle labour heavy kaam karte hai.. unko hatoge to dusre state ke log unhe replace karege...

    • @thecomment9489
      @thecomment9489 Před 8 měsíci +2

      10k capacity? Gosh, you need that much of land or reclaimed land for that. Besides that it only adds to more congestion and pollution. Instead mass public transportation infrastructure should have been developed.

  • @TejusPawar
    @TejusPawar Před 8 měsíci +2

    महाराष्ट्राचा विकास फक्त देवा भाऊंच्या हातात

  • @SwapnilBangar28
    @SwapnilBangar28 Před 8 měsíci +25

    Great work on new infrastructure being built, suggestions for different type of series where u can highlight pain points of people during travel in cities.
    Like shilphata junction, thane kalwa crossing

  • @thondupandrugtsang
    @thondupandrugtsang Před 8 měsíci +11

    Excellent information and presentation as always 👍. 🇮🇳

  • @ChetnaTupe-hd3si
    @ChetnaTupe-hd3si Před 8 měsíci +2

    Thank you deva bhau for developing maharashtra

  • @sakshisalvi8981
    @sakshisalvi8981 Před 8 měsíci +2

    Thankyou for developing maharashtra deva bhau 🙌

  • @user-qr4tu3bo9z
    @user-qr4tu3bo9z Před 8 měsíci +5

    सुंदर.
    ऐसे बडे एवं बहोत जादा खर्चवाले प्रोजेक्ट सिर्फ महाराष्ट्र या मुंबई मे ही संभव है.

  • @RajeshMane-fb2mm
    @RajeshMane-fb2mm Před 8 měsíci +3

    Excellent work DF sir❤

  • @satpalchouhan2441
    @satpalchouhan2441 Před 8 měsíci +7

    Bro is project ka permission lena bahut muskil kam tha par par aapne kar dikhaya ❤️😊👏🫶

  • @rohitraj-ig8to
    @rohitraj-ig8to Před 8 měsíci

    Another excellent video, very informative, to the point without any unnecessary details.

  • @johnabraham5806
    @johnabraham5806 Před 8 měsíci

    this is a very informative video in terms of progress, understanding the route map, connectivities etc. keep up the good work brother ❤️❤️❤️

  • @SanchitShigvan_BJP
    @SanchitShigvan_BJP Před 8 měsíci +2

    Excellent work done by Devendra Fadnavis sir....

  • @skjamilahmed2762
    @skjamilahmed2762 Před 8 měsíci

    Awesome
    Wo nice explation sachme and aapne achhe se video v shoot kiya
    Thank u so much

  • @DreamyChinmay
    @DreamyChinmay Před 8 měsíci +7

    Such an amazing work buddy.. may you reach heights that you never imagined.. ❤❤❤

  • @fivstaa
    @fivstaa Před 8 měsíci

    Top Video! Great visuals and spot on explanation!!

  • @ronishshah3881
    @ronishshah3881 Před 8 měsíci

    Excellent Video Droneman. Keep it up

  • @KavitaPotdar_BJP
    @KavitaPotdar_BJP Před 8 měsíci +2

    Hard work will surely pay off deva bhau 🙌

  • @WowMusicals
    @WowMusicals Před 8 měsíci +18

    What a fantastic video! You're simply awesome...so beautifully depicted... proud of you guys! 🎉

  • @rajeshparab1661
    @rajeshparab1661 Před 7 měsíci +1

    Excellent Work Deva Bhau 🔥🔥

  • @swarupdey8466
    @swarupdey8466 Před 8 měsíci

    As always very nicely described . 👍

  • @kns6132
    @kns6132 Před 8 měsíci

    Lovely, thanks for taking the effort 👏

  • @sde4341
    @sde4341 Před 8 měsíci +1

    Achha laga, bahot achha se discuss Kiya 👌👍

  • @TechieMoron
    @TechieMoron Před 8 měsíci

    Most awaited video. Thanks bro. ❤

  • @prashikambhore4803
    @prashikambhore4803 Před 8 měsíci +4

    Video is nice, but the photo of Eknath shinde on Thumbnail is just irrelevant😂 Coastal road is Dream project of Uddhav balasaheb Thackeray and Started under his supervision.

  • @ayushgarg7033
    @ayushgarg7033 Před 8 měsíci +5

    Woww, most awaited

  • @arifsiddiqui2347
    @arifsiddiqui2347 Před 7 měsíci

    Great Video as always...thanks buddy.

  • @techy.farooqui
    @techy.farooqui Před 8 měsíci +5

    This is one of my favourite project in the city.

  • @newsvedio
    @newsvedio Před 8 měsíci +1

    बहुत ही बडीया विडियो, मुंबई का बेस्ट प्रोजेक्ट, 2019मे मे आया था तब के काम चल रहा था. मुंबई मेरा पंसदिदा शहर हे... 🥰 mumbai

  • @mohammedazhar6012
    @mohammedazhar6012 Před 8 měsíci +3

    Stupendous project 👏 A integrated BRT corridor would have been a welcome addition…

  • @balarajuc5048
    @balarajuc5048 Před 7 měsíci

    Thanks for great content . Good luck and hope you get 500k Subs soon .

  • @amit2992
    @amit2992 Před 8 měsíci

    This video of yours is getting more views than any before it. I hope Govt agencies pay you to reproduce your content on their websites. Also, this should inspire them to plan for a better future.

  • @shreeveda
    @shreeveda Před 8 měsíci +1

    The best video on the status of the Coastal Road project. What a channel! 🎉👏👏👏👌👍

  • @MayurSonawane-ul2cx
    @MayurSonawane-ul2cx Před 8 měsíci +1

    Thank you Deva bhau for transforming India

  • @rahultalsaniya4249
    @rahultalsaniya4249 Před 8 měsíci +1

    Thanks for the update 👍

  • @HarsilPrajapati
    @HarsilPrajapati Před 8 měsíci +1

    Oh so much work has done i didn't expect that

  • @santoshkumarbhat3053
    @santoshkumarbhat3053 Před 8 měsíci +3

    I am a fan of all your videos. Keep up the good work

  • @shekharmodi
    @shekharmodi Před 7 měsíci

    Good info with creative animation. well done!

  • @vaibhavs.p3899
    @vaibhavs.p3899 Před 8 měsíci +3

    Awesome 👌👌👌👌 keep it up

  • @shridharjage3939
    @shridharjage3939 Před 8 měsíci +8

    Awesome

  • @karamjeetsinghswaich
    @karamjeetsinghswaich Před 8 měsíci +1

    Your best video till date , excellent details , keep it up

  • @KevalJambhale
    @KevalJambhale Před 8 měsíci +1

    Thank you Devendra sir for developing mumbai

  • @otomackena7610
    @otomackena7610 Před 8 měsíci

    very detailed presentation. Great work

  • @123vrao
    @123vrao Před 8 měsíci

    Thanks for the video. Good progress. If breakwater structure is built both from Nariman Point side and Raj Bhavan side, there can be cruise ship terminals and yatch/boat docks. In fact, Nariman Point can be extended towards northwest by reclaiming another 200+ acres from the sea. The new reclaimed land can be used for building office, residential towers, parks, museums and entertainment place. There should be Metro connectivity as well. This can be a successful PPP model as there will be enough private investors because of new reclaimed land. The breakwater structure will also help to mitigate the impact of waves on Marine Drive and the beach side. Dhanyavad and Jai Hind.

  • @sayedshahin2980
    @sayedshahin2980 Před 8 měsíci +1

    Thanks for the content 😊😊😊😊😊

  • @telijatin
    @telijatin Před 8 měsíci

    Salute your hard work keep it up 💪

  • @chandreshkarkera
    @chandreshkarkera Před 5 měsíci

    Lot of efforts gone on making this video. Good job 👏

  • @hitanshagarwal9708
    @hitanshagarwal9708 Před 8 měsíci

    Great job @droneman

  • @RajeshMane-fb2mm
    @RajeshMane-fb2mm Před 8 měsíci

    Superb ❤ Deva Bhau

  • @nature_Lovers.100
    @nature_Lovers.100 Před 4 měsíci

    Amazing thank for making video

  • @Ex_Muslims_Lives_Matters
    @Ex_Muslims_Lives_Matters Před 7 měsíci

    Thank you for your hard work in current infrastructures update.

  • @GargiDesai-yd4kb
    @GargiDesai-yd4kb Před 8 měsíci

    Thank u for development Mumbai

  • @kiransolim4331
    @kiransolim4331 Před 8 měsíci

    धन्यवाद फडणवीस साहेब...

  • @kaivalyakulkarni7154
    @kaivalyakulkarni7154 Před 8 měsíci

    Thank u Devendra sir for developing Mumbai....

  • @RajeshMane-fb2mm
    @RajeshMane-fb2mm Před 8 měsíci

    Great Work DF❤

  • @rupeshchimbalkar1022
    @rupeshchimbalkar1022 Před 8 měsíci +5

    Thanks to BMC and Udhdhav Balasaheb Thackeray

    • @Abhi_Srivastav_2307
      @Abhi_Srivastav_2307 Před 5 měsíci

      Specially BMC , because UBT lost the path, but BMC continues his work

  • @imviiku
    @imviiku Před 8 měsíci +2

    We can build 10 roads like this and even that won't solve the Traffic problem in Mumbai . It can only be solved with High speed Railways and point to point connectivity

    • @saurabhj4950
      @saurabhj4950 Před 8 měsíci +1

      Not all people like to use railways.
      If I want to travel fast,cars/two wheeler is the only solution inside a city.
      Even in Newyork,not all people use subway.

  • @chetankulkarni4726
    @chetankulkarni4726 Před 8 měsíci

    Thank you for giving detail information

  • @AvinashBhosale-xf8jd
    @AvinashBhosale-xf8jd Před 8 měsíci

    Devendra sir is doing great work thank u sir ....

  • @wasifafzal8564
    @wasifafzal8564 Před 8 měsíci

    Thanks for update.

  • @PawanJoshi-ds4hq
    @PawanJoshi-ds4hq Před 8 měsíci

    Great work Devendra sir

  • @hareshjagtap6736
    @hareshjagtap6736 Před 8 měsíci

    Thank u Devendra sir 👍🏻

  • @RohitKumar-kd6gu
    @RohitKumar-kd6gu Před 8 měsíci

    Wht an engineering marvel im shocked to see this type of construction never expected it!

  • @VikasKamble-cd3mu
    @VikasKamble-cd3mu Před 8 měsíci +1

    महाराष्ट्राचे आधारस्तंभ असणारे देवाभाऊ

  • @aratiwalke4861
    @aratiwalke4861 Před 8 měsíci

    देवा भाऊ सुपर फास्ट🙌

  • @NehaGhatole
    @NehaGhatole Před 8 měsíci

    Thank u DF Sir

  • @buisnesstycoon7910
    @buisnesstycoon7910 Před 8 měsíci +1

    UBT sahab ka Dream project hain coastal project

    • @Abhi_Srivastav_2307
      @Abhi_Srivastav_2307 Před 5 měsíci

      Hn bhai , 2018 m jb Wo cm the , tb se hi construction start ho Paya
      Jai Ho UBT bhau

    • @buisnesstycoon7910
      @buisnesstycoon7910 Před 5 měsíci

      @@Abhi_Srivastav_2307 coastal Road was planing from since 2010 .. But Delayed because of some Technical issue

    • @Abhi_Srivastav_2307
      @Abhi_Srivastav_2307 Před 5 měsíci +2

      @@buisnesstycoon7910 no brother, technically it was in planning from 1962 , but final construction works started by BMC in December 2018 in which foundation stone was laid on december 18 ,2018
      And at that time ,BMC was under BJP and Shiva Sena alliance in which they have 82 and 84 counsellor respectively
      So it was joint efforts of both the party not the Shiv Sena or BJP alone because none ruled the BMC alone. Were always in alliance
      And it was delayed so much , but construction nis in pace from last 2 years ,
      UBT may become a great leader like Bala Saheb but rather he ended up like this
      According to me , when UBT will start follow Bala saheb, he will realise that what he is doing , surely he will come back

  • @siddhesh2012
    @siddhesh2012 Před 8 měsíci

    Game changer for Mumbai .. plus Outer Ring Road & Western railway dedicated corridor once executed will be cherry on the cake

  • @RajeshMane-fb2mm
    @RajeshMane-fb2mm Před 8 měsíci

    Well Done Keep It Up

  • @daintellekt
    @daintellekt Před 8 měsíci +1

    Great video, very well explained 👏

  • @ronitkumar4552
    @ronitkumar4552 Před 7 měsíci

    wow wow & wow it's great project .....

  • @poojabhansali5979
    @poojabhansali5979 Před 7 měsíci

    Well made video, thanks for this

  • @drnagajima
    @drnagajima Před 7 měsíci +1

    Beautiful video!! Thanks Droneman! Is the project going to be chargeable and bikes will be allowed?

  • @SureshPatil-lz9ze
    @SureshPatil-lz9ze Před 8 měsíci

    Thank you devabhau..

  • @hemanshudas7091
    @hemanshudas7091 Před 8 měsíci +1

    Excellent information
    This is my favourite project

    • @hemanshudas7091
      @hemanshudas7091 Před 8 měsíci

      What is the process of socand phase bandra to kandivali

  • @hanzalahansari3871
    @hanzalahansari3871 Před 7 měsíci

    Wow❤ I love amchi mumbai (Bombay)

  • @AmolKamble-uo2li
    @AmolKamble-uo2li Před 8 měsíci +2

    Thank you Deva bhau for developing Maharashtra ❤

  • @amolphatak3537
    @amolphatak3537 Před 8 měsíci

    Good job dear Jaideep, i was requesting for a long time for MTHL end to end vlog from drone if possible. Thanks anyway

  • @amolpawar7987
    @amolpawar7987 Před 8 měsíci

    Great work 👏👏