Concrete Hume Pipe Practical Work || Drainage Hume pipe jointing || Hume pipe collar fixing methods

Sdílet
Vložit
  • čas přidán 10. 02. 2024
  • Concrete Hume Pipe Practical Work | Drainage Hume pipe jointing | Hume pipe collar fixing simple method @engineeringcivilstudy #engineeringcivilstudy
    Complete Hume Pipe Practical Work | Drainage Hume pipe joining| Hume pipe collar fixing simple method | Civil Engineering Practical Work | Practical Experience
    #Hume #pipe #colarfixing, #Humepipe #Installation work,RCC,DERANA SEPTIC TANKS,RCC Hume Pipes,Non Pressurized NP1,NP2,NP3 & NP4 Pipes,Water & Sewerage Works,Complete Hume Pipe Practical Work, Laying down of Cement Pipe Complete Process, RCC Hume pipe
    NP refers to Non Pressure pipes. They do not have a pressure rating and are suitable for conveying a liquid only by gravity (ex: irrigation, culverts, water drainage etc) or telephone/TV/electrical cable protection.
    NP1 PLUS Non-Pressurized Flow Center System.
    NP Plus Manual
    Product Information
    INSIDE THE BOX:
    (1) NP PLUS 1 Pump Flow Center (Grundfos UPS26-99 Pumps)
    (1) GF-3514 3-Way Insulated Valve Box
    (1) GF-2911 Set of 2 Flo-Link Double O-Ring x 1-1/4" Socket Fusion Adapters
    (1) Package with Covers, Plugs and Lag Screw
    (1) Installation and Operation Manual
    ** Typically has 2-3 week lead time **
    Product Description
    NP refers to Non Pressure pipes. They do not have a pressure rating and are suitable for conveying a liquid only by gravity (ex: irrigation, culverts, water drainage etc) or telephone/TV/electrical cable protection.
    youtube.com/@engineeringcivil...
  • Věda a technologie

Komentáře • 11