How to tell when electrical service upgrade has not been permitted!!

Sdílet
Vložit

Komentáře • 11

  • @rickymilo83
    @rickymilo83 Před 18 dny +3

    The electrical tape gave it away for me

  • @user-oc3hy2lh9x
    @user-oc3hy2lh9x Před 14 dny +2

    Pipe need be 2 inch here

  • @ZackRothstein
    @ZackRothstein Před 15 dny +1

    In CA (Los Angeles), you pull the permit thru LADWP, they come out and determine the drop from the line coming in, so that you are placing the electrical panel the shortest distance to your home from the drop.

  • @joelbaugh4693
    @joelbaugh4693 Před 15 dny +2

    So in my state if we pull a permit and the house is lived in we the electrician will tie the new service in and if the homeowner doesn’t bug the utility company they won’t won’t come out and
    do their part all tho we would have moved it from the the tension line for them

    • @Therealhomeinspectionauthority
      @Therealhomeinspectionauthority  Před 14 dny

      Interesting, over here in California when you pull a permit all utilities are automatically in the loop from DWP, they know about your install and know there roll in finalizing it.

  • @slaugh77ify
    @slaugh77ify Před 14 dny +1

    No seal on flashing either

  • @Kurt-the-Electrician
    @Kurt-the-Electrician Před 13 dny

    The flashing isn’t correct, and neither is anything else.lol

  • @4gizzle85
    @4gizzle85 Před 14 dny

    Hahahahahaha dude look close it’s already done ✔️… and they connected to the point of attachment on the roof in back .. utility company more likely than not will hook anything up as long as ya leave them enough out of the mast.. usually specified longer for higher voltages by utility .. utility will then cut back if deemed necessary.. NEC also has some exceptions here so this actually probs would end up flying even though looks bad

    • @Therealhomeinspectionauthority
      @Therealhomeinspectionauthority  Před 14 dny

      Hahahahahaha dude, are you telling me your ok with this install? Is this the quality of work you offer? Look closer, they actually installed another cable mount on the new mast head, Why would they do that if they did not intend to relocate the mount? This is sloppy unfinished work here on earth one.