Company Training Evolution E-011 FDC Connection
Vložit
- čas přidán 6. 12. 2023
- A fire attack scenario utilizing a reverse lay with 2 hose lines of a minimum of 300’ each capable of a total flow of 500gpm are hooked into a sprinkler/standpipe siamese within 3 1/2 minutes from start of evolution.
Engine shall be permitted to charge the initial supply line with tank water. A supply line hose shall be used between engine and the hydrant.