“New ADU Build” San Diego Cottage #8 (Stucco, Drainage, Elec Metering, Finishes)

Sdílet
Vložit
  • čas přidán 21. 02. 2023
  • This channel is designed to help homeowners understand what goes into building an ADU. We are located in San Diego California. For this next project I will be documenting all the phases of construction as we go along.
    www.urbnbldrs.com
    www.thisnewadu.com

Komentáře • 2

  • @christianorozco9216
    @christianorozco9216 Před rokem

    Is the under cabinet light cable just 120v romex? or is there a transformer somewhere?

    • @URBNBLDRS
      @URBNBLDRS  Před rokem

      Yes, It’s a 14/2 romex that goes to a wall switch. Or you can just run a hot supply romex and use the small switch on the actual fixture.