The Spreader Snow Plow, New MEGA Machines of the Sierra. Part I

Sdílet
Vložit
  • čas přidán 6. 01. 2010
  • 12 hours a day, 6 days a week for the past 3 months, Union Pacific and their contractors have been making history as they rebuild the SPMW 4031 and SPMW 4032 Jordan Spreaders. Here is the first, un-precidented look into the program. From scrap metal to a hand-crafted snow clearing masterpiece, BA Productions will be producing documentary on the arduous task with the trials and tribulations.
    ***This video is officially released as of 3/11/2011!!! It's taken over a year to complete, but I guarantee you will LOVE THE DRAMA AND ALL THE ACTION!! Available on Blu-ray and DVD. Order your now by visiting us on the web: www.donnerrails.com, or www.baproductions.tv. It's not posted on site yet, but in a couple of days. Call us.
  • Zábava

Komentáře • 26

  • @johncook5716
    @johncook5716 Před 10 lety +9

    what a damn good vid!!! THANKS! You bring joy back into this old railroaders life.

  • @ddblink02
    @ddblink02 Před 14 lety +3

    Very cool, Discovery channel should take note.

  • @bronwyn3896
    @bronwyn3896 Před 3 lety +1

    The music to the video is so appropriate. Powerful. I am mesmerized by the videos.

  • @jamesw.lovem.ed.5912
    @jamesw.lovem.ed.5912 Před 11 lety +3

    If you are interested in the MOW equipment for snow removal this is an excellent resource for railroad modelers because as you watch this being rebuilt you can see all of the old structure. It would make a great scratch-built show piece sitting on a side spur.

  • @David-wu7jj
    @David-wu7jj Před 3 lety +2

    Great,fantastic video thanks love watching people that know what they're

  • @century242
    @century242 Před 14 lety +3

    the differences between the old and newly rebuilt spreaders are quite impressive. Most notably from my point of view (in the seat) is the warmth and the silence of the interior.
    you get that lense unfogged?

  • @grayswandir47
    @grayswandir47 Před 12 lety +2

    Thanks for the response. I noticed a fairly clear closeup at 8:15 after posting the question. I had to Google a number of strings because the first letter in the name eluded me. It's a Speich Clear view screen. According to the web site they rotate at 1,700RPM. The windscreen must be custom made with the mounting hole before tempering the glass. You couldn't cut the hole in tempered glass.

  • @MilwaukeeF40C
    @MilwaukeeF40C Před 11 lety +1

    Smooth setting the chain right down on the enamel, pros.

  • @SOU6900
    @SOU6900 Před 7 lety +1

    This would be great to see on RFD TV.

  • @VK4LA
    @VK4LA Před 10 lety +1

    Great video for sure ....hated it ending so quickly ...lol

  • @SignalLightProductions
    @SignalLightProductions Před 14 lety +1

    Cool! I might buy it!

  • @espeeboy
    @espeeboy Před 14 lety +1

    Good stuff Brendan! Another impressive one to add to the "Winter Professionals" UP on Donner portfolio. Good to find you here on YT since I wanted to see how the 844 vids came out from last April...

  • @studinthemaking
    @studinthemaking Před 3 lety +2

    Why you have to do it in 3 months? Snow doesn’t come that late and early in the Rockies.

  • @obergssin
    @obergssin Před 10 lety +1

    Human "engine"uity at work .... amazing ....!

  • @mrbluenun
    @mrbluenun Před 12 lety +2

    Almost to all intents a new train then. Nice job not absolutely Engineered correctly but time has to be taken into account.

  • @coldblue9mm
    @coldblue9mm Před 12 lety +1

    I was a little disappointed to see them using a torch to blow holes instead of using a mag drill and drilling holes when mounting brackets on the wings. Looks a little like a shortcut that they shouldn't have taken. I also hope they haven't over complicated what was once a fairly basic but very competent set up. It seems like the more electronics, the more chances of failure out in the field. I guess I'll have to wait and see.

  • @Jfrmr1
    @Jfrmr1 Před 13 lety +1

    When is it going to be released? I have been keeping an eye on ba productions webpage and haven't seen any updates.

  • @jharrigan69
    @jharrigan69 Před 12 lety

    ther're like windshield wipers, they spin fast to keep the snow off.

  • @Dargaard
    @Dargaard Před rokem

    Anyway to still get these videos?

  • @railfann
    @railfann Před 12 lety +1

    @Philip3119 They are not self-propelled. They are pushed by ex-Southern Pacific GP38-2 that are specially modifed for snow flanger and speader service. Two of these locomotives are used with spreaders, one on each end of the consist. Numerous pictures of them on the interenet...or buy these guy's videos. I have. Railfann

    • @coldblue9mm
      @coldblue9mm Před 6 lety

      railfann We don't use one loco on each end of the consist. Where did you get that info? We use two in line to shove on our Jordan Spreaders. In the Cascades, we use one smaller loco and one road unit. There's nothing set in concrete, we do what we need to do to get the job done.

  • @michaelslee6483
    @michaelslee6483 Před 9 lety

    like to have those guys on my team

  • @grayswandir47
    @grayswandir47 Před 12 lety

    What are the round gizmos at 8:12?

  • @bradhig
    @bradhig Před 13 lety

    What are those bars on top of the engines for?

    • @jamesshanks2614
      @jamesshanks2614 Před 7 lety +1

      bradhig
      Icicle breakers that break off icicles from the roof of the snow sheds so someone doesn't get hurt by falling ice.