The line they now run on is a dedicated line built for high speed, meaning they can run much faster than if they ran on the old route, the huge problem with high speed rail in Britain is that we run high and low speed services on the same rails, so often delays are caused by clashes between the 2, unlike in Japan and France.
Put simply, SPEED... Journeys from St Pancras are a lot quicker than journeys from Waterloo. Also the former International Station will eventually be used by domestic services, as the platforms are desperately needed by SWT.
The line they now run on is a dedicated line built for high speed, meaning they can run much faster than if they ran on the old route, the huge problem with high speed rail in Britain is that we run high and low speed services on the same rails, so often delays are caused by clashes between the 2, unlike in Japan and France.
They should run a TGV TMST into Waterloo again on a farewell run.
They can't, they took off the 3rd rail shoe
Put simply, SPEED... Journeys from St Pancras are a lot quicker than journeys from Waterloo.
Also the former International Station will eventually be used by domestic services, as the platforms are desperately needed by SWT.
They will be used for reading and Windsor services from December 2018.
And as well, the lines the Waterloo Eurostar ran on were very congested, which could cause delays
Waterloo gong but never forgotten alwys in or Eurostar hart's
They can't, no third rail