The forgotten plans of the North East Line

Sdílet
Vložit
  • čas přidán 15. 12. 2021
  • #SBSTransit #NorthEastLine #SGTrains
    The North East Line is the first fully underground MRT line in Singapore and the first fully automated MRT train in Singapore. It is also SBS Transit's first MRT line with three rolling stocks, C751A, C751C and C851E. With a total of 16 stations and 1 is under construction. But for many of you didn't know is that North East Line wasn't ment to look like this. there's a forgotten plans for the North East Line in the 1980s and 1990s. You wanna know what it looks like? Find out more by watching this video.
    What do you guys think about the forgotten plans of the North East Line? Let me know in the comments below.
    Thanks for watching and I'll see you next time. Take care and stay safe.
    Music:
    Miami Nights 1984 - Accelerated
    • Miami Nights 1984 - Ac...
    Elektronomia - Breeze (temp intro & outro)
    • Elektronomia - Breeze ...
  • Auta a dopravní prostředky

Komentáře • 107

  • @travelboy18102
    @travelboy18102 Před 2 lety +5

    Can’t wait for the premiere!

  • @user-oj4xm6by5b
    @user-oj4xm6by5b Před 2 lety +26

    Elevated North East Line......that will look cool to see!

    • @vertus977
      @vertus977 Před 2 lety +2

      I wouldnt be used to it

    • @Tobu9105F
      @Tobu9105F Před 2 lety +3

      i would want to see it

    • @coolman444
      @coolman444 Před 2 lety

      @@Tobu9105F too bad they didnt

    • @LMGamerz40
      @LMGamerz40 Před rokem

      @@vertus977 because it may copy the design of the Philippine's LRT 2 in metro manila and masinag, antipolo Reason: Usage of the The Overhead wire.

  • @FakeHaqimy
    @FakeHaqimy Před měsícem +1

    It would be cool to see NEL be overground in an alternate reality.

  • @agentd6723
    @agentd6723 Před 2 lety +11

    Imagine that the NEL was actually elevated. The estates from Sengkang to Serangoon would be noisy as the rolling stick was buit by Alstom. Not mentioning my mind was blown after finding out that LTA tried extending it all the way to Pulau Ubin.

    • @ethanang8099
      @ethanang8099 Před rokem +4

      All the way to Tekong, perhaps in also helping the MINDEF by saving the boat trip from Changi.

    • @agentd6723
      @agentd6723 Před rokem +2

      @@ethanang8099 hmmm maybe LTA did not go crazy while planning the NEL

    • @TimothyMokCJ
      @TimothyMokCJ Před rokem +1

      I think it will be noisy, but they can learn from the KTM line. The KTM line uses Metro-Cammell trains and Japanese Kinki Sharyo trains.

    • @namele55777
      @namele55777 Před 10 měsíci

      being built by alstom doesn't mean it will be noisier than other rail companies

    • @piglette0021
      @piglette0021 Před 29 dny

      PULAU UBIN????!!!!!!!!!

  • @youcanpunchmeintheface
    @youcanpunchmeintheface Před 10 měsíci +5

    Those crazy plan for Tekong and Ubin Island extension would be more feasible if they wanted to further develop them as either touristic or economical zone. But I love them more just the way they are right now. Let those island to be preserved.

    • @po1ariser
      @po1ariser Před 10 měsíci +1

      cant be hard to imagine though when all the land is completely built up: BTO flats will be on pulau ubin, then we might see the NEL extension in the near future

    • @youcanpunchmeintheface
      @youcanpunchmeintheface Před 10 měsíci

      @@po1ariser Yeah, it's gonna be quite a while till govt reconsider the option.

  • @DarkHonour
    @DarkHonour Před 2 lety +8

    I was told that overhead catenary was used for NEL since it was fully underground and LTA could experiment with trying this system. I think Serangoon - Hougang was already quite built up so it would be tough to build the elevated section. Maybe Buangkok onwards could have been elevated. Hougang or Buangkok could potentially be built at-grade or half-sunken and also use up more land than underground. I recall seeing the Pulau Ubin & Pulau Tekong rail alignment in a textbook during primary school during the late 90s and later wondered what happened to it.

    • @lzh4950
      @lzh4950 Před 3 měsíci

      Building NEL at-grade/half-sunken/elevated would expose it to rain though & make it harder to be fully automated/driverless, as the signalling system would also have to be smart enough to know how much the trains' braking distance increases when tracks are made more slippery by rain

  • @sussy001
    @sussy001 Před 2 lety +6

    Maybe the NEL extension can be above ground

  • @ImpossibleGamingSG
    @ImpossibleGamingSG Před 2 lety +5

    The forgotten plans of NEL is cool. But I hope that the government will build a connection to Pulau Ubin and Pulau Tekong (By Underpass with cars and buses. No need MRT)

  • @strongstrengthtv
    @strongstrengthtv Před 2 lety +4

    Faster. Can't wait. But the more they build lines, the more they "rationalize" the BUSES.

  • @singaporemrtbustransport6745

    Nice 👍👍

  • @smrtc151productions4
    @smrtc151productions4 Před 2 lety +19

    I always wondered why are lines that are not EWL and NSL not elevated

    • @peterxdr
      @peterxdr Před 2 lety +8

      Land scarcity and noise level are probably the main reasons so

    • @vedantganesh6923
      @vedantganesh6923 Před 2 lety +9

      I personally really like the elevated sections of the EWL and the NSL, which mean that you can watch Singapore go by, but I wouldn't mind a fully underground NSEWL system with automated trains.

    • @peterxdr
      @peterxdr Před 2 lety +7

      @@vedantganesh6923 I like watching out of the windows of trains too, anyone who says they don't are lying, especially when visiting new areas I've not been to before. I personally prefer overground tracks, because not only are the views nice, it costs less to build overground sections.

    • @nathantan4266
      @nathantan4266 Před rokem +2

      @@vedantganesh6923 Me too. I enjoy seeing the views. Elevated MRT tracks allows you to see the development of Singapore over the years, especially the section between Commonwealth to Redhill, many things you used to see now aren’t the same 20 years ago.

    • @Dr_Sex69
      @Dr_Sex69 Před rokem +2

      i heard Jurong Region Line is going to be elevated

  • @RP-jv8xr
    @RP-jv8xr Před 2 lety +6

    today I took the Sentosa monorail a few times. First I start at Vivo city station then I board the train to the second station, Resorts world station to go to the SEA Aquarium, after that I took another train back to Vivo city station to have lunch at Food Republic. Later I took another Monorail to the fourth station, Beach station to get my souvenir, then later we go back to the first station, Vivo city station to look around for awhile before taking the North-East Line and Downtown Line home.

  • @user-jn5ww8xr7h
    @user-jn5ww8xr7h Před 10 měsíci +1

    🎉

  • @GavVlogNTrainspot
    @GavVlogNTrainspot Před rokem +7

    I feel the line can still extend to Pulau Tekong if they elevate NEL after punggol coast. Also it can continue LRT punggol to Punggol Coast as form of interchange station, who knows it can be a huge plan including bus interchanges also

    • @wwlhtcwwlhtc8757
      @wwlhtcwwlhtc8757 Před rokem +2

      then for the BMT recruits it will be very convenient with NEL tekong extension. tekong will no longer seem too offshore for them

    • @ethanang8099
      @ethanang8099 Před rokem +1

      ​@@wwlhtcwwlhtc8757 They will be the stations only meant for authorised personnels and army boys.
      This way, it can save MINDEF on the boat trip. Or the boat is used for the people living in Pasir Ris and the East.

  • @Iamconfusing
    @Iamconfusing Před rokem +2

    technically northeast line has plans to be extended to pungoll coast, kinda like marina south pier but for the purple line

  • @paulhaberer2132
    @paulhaberer2132 Před 2 lety +3

    I wish to go on it when it is finished!!!!

  • @archie447
    @archie447 Před 28 dny +1

    0:49 OMG NE2

  • @RP-jv8xr
    @RP-jv8xr Před 2 lety +1

    I just came back from Sentosa and I got a Sentosa express train model with new livery(blue) because its my favorite colour.

  • @thechongsfamily8674
    @thechongsfamily8674 Před 10 měsíci +2

    Lol , maybe next time got Mrt operated by Tower transit at the west side cuz mostly of the tower transit buses are at Jurong East or Bukit Batok . Maybe the go ahead train will go through East or Northern side of Singapore 😂

  • @RP-jv8xr
    @RP-jv8xr Před 2 lety +1

    And the Sentosa monorail train souvenir I got today is actually an limited edition item with new livery.

  • @ggggvvv
    @ggggvvv Před rokem +1

    okay the tekong one....its in the army premises which the govt will allow army trainings, but for pulau ubin might be feasible.
    for ubin it will be called woodedge, katam besar, ketam north, ubin coast.

  • @Travellers_footage
    @Travellers_footage Před 2 lety +2

    Did you remove the monorail vid becoz there wasn’t any sound?

  • @namele55777
    @namele55777 Před 10 měsíci +1

    it would be much cheaper to build above-ground than digging underground

  • @aehighfmcolinchin
    @aehighfmcolinchin Před 2 lety +5

    However that would destroy the forests at Pulau Ubin and Tekong

    • @christopheryongmenglee7569
      @christopheryongmenglee7569 Před 2 lety +1

      Did you say pulau Ubin and Pulau Tekong I did not know north east line go to 2 islands

    • @bluexecutor6635
      @bluexecutor6635 Před 2 lety +1

      @@christopheryongmenglee7569 It was the original 1990s idea. Although if ever LTA announced that they will actually extend the line to those two islands if they build future residential areas there, the track might have to be elevated to cross the straits. We will just have to see what are the current plans for the Tekong landfill area and if it will be a residential or industrial area.

  • @squidgame6297
    @squidgame6297 Před 2 lety +1

    Hi ZC, i surpassed your subs!

  • @nuffaildaniaelle977
    @nuffaildaniaelle977 Před rokem +1

    Oh My God!?! I knew where is NE02 station!!! It was at Keppel interchange with Circle Line Stage 6 thooo!!

  • @loochewhui2920
    @loochewhui2920 Před 2 lety +2

    Kampong Baruh is NE2.

  • @piglette0021
    @piglette0021 Před 29 dny

    Tunnelling is more expensive than building above ground.

  • @johnsonloh9601
    @johnsonloh9601 Před 9 měsíci +1

    The North East line have no (NE 2)Kangpong Bahru. 1:01

  • @singaporemrtbustransport6745

    Elevated North East line will be like Bangkok Thailand 💜 line above ground level

  • @zanderbusedits2626
    @zanderbusedits2626 Před rokem +1

    I remember riding that but it would be better if the plan gets elevated so yeah

  • @ababalalalaui9792
    @ababalalalaui9792 Před 2 lety +1

    but how would they extend the nel to pulau ubin and tekong doe?? land reclamation or an underwater bridge and its sole purpose is for the nel? would be cool doe ngl, train to pulau ubin

  • @sbs5061s
    @sbs5061s Před 2 lety +2

    After watching i had an idea to make elevated nel in roblox

  • @RP-jv8xr
    @RP-jv8xr Před 2 lety +1

    What happened to the video that was recently uploaded?

  • @bogi2989
    @bogi2989 Před 2 lety +2

    The extension to jalan Kayu which I saw is feasible for any line just not the northeast line reason why not nel.
    1.You need Metal wires to transmit the overhead power.
    2.must be build under ground due NEL limitation.
    3.you need clamps for wire and whatnot.
    4. Possible for another 3rd rail invisible for overhead.
    This is why LtA choose early to stick to 3rd rail.
    North east is just a trial line for overhead

    • @coolman444
      @coolman444 Před 2 lety

      where u get that info?

    • @TimothyMokCJ
      @TimothyMokCJ Před rokem +1

      The extension to Jalan Kayu is replaced by Seletar Line but blocked the potential of going to North East Line to prevent overcrowding and choking the entire system. Overhead rail is optional, just that the KTM is just trial line for overhead.

  • @RP-jv8xr
    @RP-jv8xr Před 2 lety +1

    Tomarrow on the 18th of December 2021, im going to Sentosa.

  • @loochewhui2920
    @loochewhui2920 Před 2 lety +1

    Even though there are 16, it’s 18 in the future. NE2 will open in the future.

  • @shiningsingaporesinga7433

    I have a question: Why is there a C751A/C train further down Punggol MRT Terminal?

  • @KamonianVortexOfficialSite

    If the plans weren't forgotten, I wonder how the NEL would be like now. Probably better to have overhead rails and stations.

  • @Travellers_footage
    @Travellers_footage Před 2 lety +3

    Omg 20th and 22nd I’m not free pls don’t do the premier on that date thx I’m going Sentosa to seat the newly build skyhelix which ofc used to be the tiger tower in Sentosa and 22nd of December I’m going to play badminton with my friend

  • @nuffaildaniaelle977
    @nuffaildaniaelle977 Před rokem +1

    If it was same as ktm komuter, the rail sounds tho... Ergh... So hurtful

  • @jenyqiqi8507
    @jenyqiqi8507 Před 16 dny

    Are this branch line elevated?

  • @singaporemrtbustransport6745

    Maybe in the after NE18 Punggol Coast Stn then above ground to NE19 ?.... NE20 ?.... NE21 ?....

  • @nuffaildaniaelle977
    @nuffaildaniaelle977 Před rokem +1

    What is NE2 station thoo???

  • @carmentan9336
    @carmentan9336 Před 2 lety +2

    How about hhpsd on NEL evelated

  • @nuffaildaniaelle977
    @nuffaildaniaelle977 Před rokem

    NE02 located at Keppel Terminal Ave

  • @warabimochi1111
    @warabimochi1111 Před rokem +1

    0:11 これってcgの写真ですか?
    Is this picture real?

  • @user-ee4be9iq3n
    @user-ee4be9iq3n Před měsícem

    north east line elevated

  • @airplane_guy396
    @airplane_guy396 Před rokem +1

    between dhoby ghaut and little india they should build istana mrt

  • @strongstrengthtv
    @strongstrengthtv Před 2 lety +1

    Where to find the document at 2:05?

    • @tansoon8257
      @tansoon8257 Před 2 lety

      commons.m.wikimedia.org/wiki/File:North_East_Line_planning_map.png
      Here ya go

  • @syahirszulfiqurchennal4258

    Can u make forgotten plans for the circle line

    • @coolman444
      @coolman444 Před 2 lety

      he did czcams.com/video/7cKFDDitYSc/video.html

  • @strongstrengthtv
    @strongstrengthtv Před 2 lety +1

    I think I know what is station number 2.. it's going to brani island.. either Sentosa express or NEL or both also can.. no need to go 4th floor to take train at vivocity.. (ridiculous)..

  • @TheSearleFamily123
    @TheSearleFamily123 Před 2 lety +1

    What do you get when you cross the SBS Transit North East line's electrification and the SMRT Thomson-East Coast line's signalling system? Sydney Metro!
    Notes on technology and rolling stock (I told you more earlier):
    * The half-height and full-height platform screen doors of Sydney Metro were supplied by Faiveley Transport.
    * The Alstom OPTONIX 2-level IGBT-VVVF drive for the Alstom Metropolis of Sydney Metro is similar to that of Shanghai Metro Line 15.
    * It's unknown whether the onboard information systems are VPIS (like NEL) or TTIS (like CCL, DTL and TEL).
    * The Sydney Metro trains consist of 6 carriages each, and there is an option to increase to 8 carriages in 2024 when the line is extended to Bankstown.

  • @BChousiudth
    @BChousiudth Před 2 lety +1

    👍😍🤗Did they stop building

  • @TaiYeanHwee
    @TaiYeanHwee Před 2 lety

    I want to have the extension of the NEL.

  • @tohjingjiebrandonkonghwasc8839

    i also taught about nel to malaysia...

  • @tinoi-yz2fs
    @tinoi-yz2fs Před 2 lety +1

    Refurbished C751A in the thumbnail there!

  • @shiguoliu7914
    @shiguoliu7914 Před 2 lety +1

    On ground is kaos

  • @ImpossibleGamingSG
    @ImpossibleGamingSG Před 2 lety +1

    Why not extend the northeast line to Changi-airport via Pulau Ubin and Pulau tekong.

  • @kensim8378
    @kensim8378 Před rokem +1

    no needforextensionsto tekong and ubin asnotmuch pple livethere!

  • @christopherteo7795
    @christopherteo7795 Před 4 měsíci

    Extra bruh keepel north will open now

  • @user-zb5fc3gp7w
    @user-zb5fc3gp7w Před 5 měsíci +1

    What

  • @svc143bsoe
    @svc143bsoe Před 2 lety +1

    NEL Stations will be extend from NE19 to NE25 in Elevated with 5th Generation Train Debut in 2037 with Refurbished C751A, Refurbished C751C, C851E on NEL and 4th Generation Trains Debuts In 2030s with NRFF Extension to 2041 Like TWE, C751A Will Have 2nd Refurbishement In 2035, C751A Is My Most Personal Favourite Train

  • @andrewong1640
    @andrewong1640 Před 2 lety +1

    Wpw

  • @marccrisson
    @marccrisson Před 2 lety +1

    I don’t like elevated trains. Underground is better

  • @8xx064
    @8xx064 Před rokem +2

    Where is NE2?

    • @diggasinparis
      @diggasinparis Před rokem +2

      Between HarbourFront and Outram Park is a Shell Station Called Kampong Bahru, Designed like a British Colonial House

    • @diggasinparis
      @diggasinparis Před rokem +2

      Dunno why they didnt